The Dzero detector is scheduled for a major upgrade between 1996 and 1999. This note describes the specifications and configuration of the physical Input/Output devices and instrumentation of the 2 Tesla Superconducting Solenoid. The Solenoid and the VLPC cryostats both reside on the detector platform and are cooled by the Dzero Helium Refrigerator. The cryogenic process control s for these two components will be an extension of the TI565 programmable logic controller system used for other Dzero cryogenic controls. Two Input/Output Bases will be installed on the Dzero detector platform near the cryo corner. These I/O bases will handle all the sensor input and process control output devices from the Solenoid and VLPC cryostats. Having the I/...
The Inter Cryostat Detector (ICD) used in Run I of the D0 Experiment will be inoperable in the centr...
The D0 cryogenic control system has 3 I/O bases and 1 25 amp 24vdc power supply. Each I/O base uses ...
This procedure is used when it is necessary to operate the solenoid energization, controls, interloc...
This document has served as the specification for the energization, control, interlocking and quench...
D-Zero installed a new 2 Tesla superconducting solenoid magnet into the central tracking region of t...
The DZERO VLPC Cryostat and the Superconducting Solenoid both require an insulating Vacuum of 10{sup...
This engineering note documents a communication link between the D0 cryo/gas control system and the ...
This engineering note documents the Dzero Superconducting Solenoid Platinum RTD, Carbon Glass RTD, a...
The helium refrigerator was cooled down and operated for the third time since its installation. D-Ze...
This Dzero Engineering note describes the method for which the 2 Tesla Superconducting Solenoid Fast...
This engineering note documents the thermal contraction analysis that was done for the D-Zero soleno...
The D0 collaboration has undertaken an aggressive upgrade of its central tracking system. The existi...
Fermi National Accelerator Laboratory (FNAL) is involved in the development of a 100 MeV superconduc...
This engineering note documents the proposed cryogenic line routing from the liquid helium (LHe) ref...
Fermi National Accelerator Laboratory (FNAL) is involved in the development of a 100 MeV superconduc...
The Inter Cryostat Detector (ICD) used in Run I of the D0 Experiment will be inoperable in the centr...
The D0 cryogenic control system has 3 I/O bases and 1 25 amp 24vdc power supply. Each I/O base uses ...
This procedure is used when it is necessary to operate the solenoid energization, controls, interloc...
This document has served as the specification for the energization, control, interlocking and quench...
D-Zero installed a new 2 Tesla superconducting solenoid magnet into the central tracking region of t...
The DZERO VLPC Cryostat and the Superconducting Solenoid both require an insulating Vacuum of 10{sup...
This engineering note documents a communication link between the D0 cryo/gas control system and the ...
This engineering note documents the Dzero Superconducting Solenoid Platinum RTD, Carbon Glass RTD, a...
The helium refrigerator was cooled down and operated for the third time since its installation. D-Ze...
This Dzero Engineering note describes the method for which the 2 Tesla Superconducting Solenoid Fast...
This engineering note documents the thermal contraction analysis that was done for the D-Zero soleno...
The D0 collaboration has undertaken an aggressive upgrade of its central tracking system. The existi...
Fermi National Accelerator Laboratory (FNAL) is involved in the development of a 100 MeV superconduc...
This engineering note documents the proposed cryogenic line routing from the liquid helium (LHe) ref...
Fermi National Accelerator Laboratory (FNAL) is involved in the development of a 100 MeV superconduc...
The Inter Cryostat Detector (ICD) used in Run I of the D0 Experiment will be inoperable in the centr...
The D0 cryogenic control system has 3 I/O bases and 1 25 amp 24vdc power supply. Each I/O base uses ...
This procedure is used when it is necessary to operate the solenoid energization, controls, interloc...