This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, fie...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...
Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Un...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections cond...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [C...
Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [C...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action...
This report serves as the combined annual report for post-closure activities for the following close...
This report serves as the combined annual report for post-closure activities for the following close...
Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CA...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...
Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Un...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections cond...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
This report provides the results of the annual post-closure inspections conducted at the closed Corr...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [C...
Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [C...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action...
This report serves as the combined annual report for post-closure activities for the following close...
This report serves as the combined annual report for post-closure activities for the following close...
Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CA...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...
Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Un...
Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action ...