For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel ...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...
Maintaining compliance with environmental regulatory requirements is a significant priority in succe...
Argonne National Laboratory (ANL-E) has recently completed the decontamination and decommissioning (...
SRS recently completed an approximately three year effort to decommission two SRS reactors: P-Reacto...
The aging of research reactors worldwide has resulted in a heightened awareness in the international...
At the Rocky Flats Environmental Technology Site (RFETS), the D&D task is enormous. Tons of plut...
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deac...
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facili...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
During the past seven years, four research reactors at Oak Ridge National Laboratory (ORNL) have bee...
The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate...
The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a C...
The Heavy Water Components Test Reactor (HWCTR) facility (Figure 1) was built in 1961, operated from...
Argonne National Laboratory has developed a novel decontamination solvent for removing oxide scales ...
SRS recently completed a four-year mission to decommission {approx}250 excess facilities. As part of...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...
Maintaining compliance with environmental regulatory requirements is a significant priority in succe...
Argonne National Laboratory (ANL-E) has recently completed the decontamination and decommissioning (...
SRS recently completed an approximately three year effort to decommission two SRS reactors: P-Reacto...
The aging of research reactors worldwide has resulted in a heightened awareness in the international...
At the Rocky Flats Environmental Technology Site (RFETS), the D&D task is enormous. Tons of plut...
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deac...
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facili...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
During the past seven years, four research reactors at Oak Ridge National Laboratory (ORNL) have bee...
The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate...
The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a C...
The Heavy Water Components Test Reactor (HWCTR) facility (Figure 1) was built in 1961, operated from...
Argonne National Laboratory has developed a novel decontamination solvent for removing oxide scales ...
SRS recently completed a four-year mission to decommission {approx}250 excess facilities. As part of...
The project scope of work included the complete decontamination and decommissioning (D and D) of the...
Maintaining compliance with environmental regulatory requirements is a significant priority in succe...
Argonne National Laboratory (ANL-E) has recently completed the decontamination and decommissioning (...