The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Waste Integrated Performance and Safety Codes (NEAMS Waste IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. To meet this objective, NEAMS Waste IPSC M&S capabilities will be applied to challenging spatial domains, temporal domains, multiphysics couplings, and multiscale couplings. A strategic verification and validation (V&V) goal is to establish evidence-based metrics for the level of confidence in M&...
Most waste management activities are decided upon and carried out in a public or semi-public arena, ...
In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectivenes...
Developing new fuels and qualifying them for large-scale deployment in power reactors is a lengthy a...
The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simula...
This report describes the progress in fiscal year 2010 in developing the Waste Integrated Performanc...
The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simula...
This report describes the specification of a challenge problem and associated challenge milestones f...
This report describes a gap analysis performed in the process of developing the Waste Integrated Per...
The Advanced Modeling and Simulation Office within the DOE Office of Nuclear Energy (NE) has been ch...
The Nuclear Energy Computational Fluid Dynamics Advanced Modeling and Simulation (NE-CAMS) system is...
The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring truly ...
The Department of Energy's Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program has been ...
This report details the progress made in the development of the Reprocessing Plant Toolkit (RPTk) fo...
This work (1) reviews the current concept ad~ internationally on the disposal of highlevel nuclear w...
The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capab...
Most waste management activities are decided upon and carried out in a public or semi-public arena, ...
In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectivenes...
Developing new fuels and qualifying them for large-scale deployment in power reactors is a lengthy a...
The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simula...
This report describes the progress in fiscal year 2010 in developing the Waste Integrated Performanc...
The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simula...
This report describes the specification of a challenge problem and associated challenge milestones f...
This report describes a gap analysis performed in the process of developing the Waste Integrated Per...
The Advanced Modeling and Simulation Office within the DOE Office of Nuclear Energy (NE) has been ch...
The Nuclear Energy Computational Fluid Dynamics Advanced Modeling and Simulation (NE-CAMS) system is...
The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring truly ...
The Department of Energy's Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program has been ...
This report details the progress made in the development of the Reprocessing Plant Toolkit (RPTk) fo...
This work (1) reviews the current concept ad~ internationally on the disposal of highlevel nuclear w...
The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capab...
Most waste management activities are decided upon and carried out in a public or semi-public arena, ...
In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectivenes...
Developing new fuels and qualifying them for large-scale deployment in power reactors is a lengthy a...