This memo summarizes the results of the Formal (90%) Design Review process and meetings held to evaluate the design of the Flexible Receiver Adapters, support platforms, and associated equipment. The equipment is part of the Flexible Receiver System used to remove, transport, and store long length contaminated equipment and components from both the double and single-shell underground storage tanks at the 200 area tank farms
Since the mid 1940s, the Department of Defense (DOD) and the Department of Energy (DOE) have conduct...
The Waste Dislodging and Conveyance System (WD and CS) and other components of the Tank Waste Retrie...
This document summarizes the analyses and review performed to develop and validate the design of the...
A mixer pump was installed in the 1.07 m (42-in.) riser of the central pump pit of tank 241-AP-102 t...
This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Recei...
This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Recei...
This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitiga...
The East and West Tank Farm Standing Order 97-01 requires that the PMST be modified to include purgi...
This Design Review Report (DRR) documents the contractor design verification methodology and records...
This Design Review Report (DRR) documents the contractor design verification methodology and records...
The long length contaminated equipment was designed and built to aid in the remote removal and trans...
A mixer pump has been used to mitigate the hydrogen build-up in tank 241SY101 (SY101), located in th...
A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underg...
This Design Review Report (DRR) documents the closure of all Review Cormnent Record sheets associate...
This report provides the results of a review conducted on existing operating specifications and safe...
Since the mid 1940s, the Department of Defense (DOD) and the Department of Energy (DOE) have conduct...
The Waste Dislodging and Conveyance System (WD and CS) and other components of the Tank Waste Retrie...
This document summarizes the analyses and review performed to develop and validate the design of the...
A mixer pump was installed in the 1.07 m (42-in.) riser of the central pump pit of tank 241-AP-102 t...
This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Recei...
This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Recei...
This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitiga...
The East and West Tank Farm Standing Order 97-01 requires that the PMST be modified to include purgi...
This Design Review Report (DRR) documents the contractor design verification methodology and records...
This Design Review Report (DRR) documents the contractor design verification methodology and records...
The long length contaminated equipment was designed and built to aid in the remote removal and trans...
A mixer pump has been used to mitigate the hydrogen build-up in tank 241SY101 (SY101), located in th...
A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underg...
This Design Review Report (DRR) documents the closure of all Review Cormnent Record sheets associate...
This report provides the results of a review conducted on existing operating specifications and safe...
Since the mid 1940s, the Department of Defense (DOD) and the Department of Energy (DOE) have conduct...
The Waste Dislodging and Conveyance System (WD and CS) and other components of the Tank Waste Retrie...
This document summarizes the analyses and review performed to develop and validate the design of the...