Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The C...
Performance assessment for canister cleaning system in the KE Basin. Information obtained from this ...
The 105-KE Basin contains 1,150 Metric Tonnes of Uranium (MTU) of N Reactor fuel, along with less th...
This study of the design basis capacity of process systems was prepared by Fluor Federal Services fo...
Developmental testing of the primary cleaning station for spent nuclear fuel (SNF) and canisters is ...
This documents the documentation that is required to be turned over to Operations with the Canister ...
The mission of the Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying Facility (CVDF) is to achieve...
The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as par...
The Spent Nuclear Fuel Path Forward Project (SNF Project) has been established to develop engineered...
In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ...
Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE ...
Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Pr...
In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while ...
A spent nuclear fuels (SNF) repackaging and storage facility was designed for the Idaho National Eng...
Manipulator system cold validation testing (CVT) was performed in support of the Fuel Retrieval Syst...
The mission of the Spent Nuclear Fuel (SNF) Project is to remove the fuel currently located in the K...
Performance assessment for canister cleaning system in the KE Basin. Information obtained from this ...
The 105-KE Basin contains 1,150 Metric Tonnes of Uranium (MTU) of N Reactor fuel, along with less th...
This study of the design basis capacity of process systems was prepared by Fluor Federal Services fo...
Developmental testing of the primary cleaning station for spent nuclear fuel (SNF) and canisters is ...
This documents the documentation that is required to be turned over to Operations with the Canister ...
The mission of the Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying Facility (CVDF) is to achieve...
The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as par...
The Spent Nuclear Fuel Path Forward Project (SNF Project) has been established to develop engineered...
In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ...
Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE ...
Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Pr...
In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while ...
A spent nuclear fuels (SNF) repackaging and storage facility was designed for the Idaho National Eng...
Manipulator system cold validation testing (CVT) was performed in support of the Fuel Retrieval Syst...
The mission of the Spent Nuclear Fuel (SNF) Project is to remove the fuel currently located in the K...
Performance assessment for canister cleaning system in the KE Basin. Information obtained from this ...
The 105-KE Basin contains 1,150 Metric Tonnes of Uranium (MTU) of N Reactor fuel, along with less th...
This study of the design basis capacity of process systems was prepared by Fluor Federal Services fo...