An engineering task plan was developed that presents the resources, responsibilities, and schedules for the development, test, and deployment of the nested, fixed-depth fluidic sampling and at-tank analysis system. The sampling system, deployed in the privatization contract double-shell tank feed tank, will provide waste samples for assuring the readiness of the tank for shipment to the privatization contractor for vitrification. The at-tank analysis system will provide ''real-time'' assessments of the sampled wastes' chemical and physical properties. These systems support the Hanford Phase 1B Privatization Contract
The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial ...
This document summarizes the analysis of 3 basic criteria for the sampling systems that will provide...
The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioacti...
This engineering task plan identifies the resources, responsibilities, and schedules for the develop...
Under the Hanford Site River Protection Project (RPP) privatization strategy, the U.S. Department of...
Under the Hanford Site Tank Waste Remediation System (TWRS) privatization strategy, the US Departmen...
The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization c...
This preliminary Level 2 Component Specification establishes the performance, design, development, a...
This document will describe the functions and requirements of the at-tank analysis system concept de...
The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Ener...
This report summarizes the results of cold testing, completed by AEAT, as part of the proof-of-princ...
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample co...
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness...
Characterization Engineering (CE) continues to make progress in support of the project goal of chara...
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns a...
The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial ...
This document summarizes the analysis of 3 basic criteria for the sampling systems that will provide...
The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioacti...
This engineering task plan identifies the resources, responsibilities, and schedules for the develop...
Under the Hanford Site River Protection Project (RPP) privatization strategy, the U.S. Department of...
Under the Hanford Site Tank Waste Remediation System (TWRS) privatization strategy, the US Departmen...
The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization c...
This preliminary Level 2 Component Specification establishes the performance, design, development, a...
This document will describe the functions and requirements of the at-tank analysis system concept de...
The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Ener...
This report summarizes the results of cold testing, completed by AEAT, as part of the proof-of-princ...
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample co...
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness...
Characterization Engineering (CE) continues to make progress in support of the project goal of chara...
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns a...
The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial ...
This document summarizes the analysis of 3 basic criteria for the sampling systems that will provide...
The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioacti...