This report is a summary of the following topics of the first quarter of 2000: (1) Han Padron Associates (HPA) provided conceptual structural design of the mooring buoy; and (2) they completed partial review of the HPA design and designed the sealing elements
This report establishes an industry knowledge base for existing anchoring and mooring techniques as ...
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1981.MICROFICHE CO...
The original hydraulic system controlling the SeaSoar owned by Geophysical Institute, University of ...
The following topics are summarized for the 2nd quarter of 2000: (1) We amended the structural desig...
The main conclusions from the work carried out under this contract are: An ordinary seafarer can lea...
The division of Electricity at Uppsala University runs a project called Lysekil project, they have d...
Mooring system analysis and evaluation requires the establishing of design criteria and operational ...
This report covers the techniques of deploying and recovering the moorings used by the Buoy Project ...
Master's thesis in Offshore TechnologyDue to the extension of the Gullfaks license, Statoil needs to...
Basic criteria and planning guidelines for the design of fleet moorings are presented for use by qua...
The Woods Hole Oceanographic Institution Buoy Group's field work for the international POLYMODE pro...
Results are presented from previous investigations of three different versions of latching-controlle...
This study consists of a literature review of various types of moored buoy systems. Depending on its...
The physical principle that governs how ships are moored to a port has changed little over the years...
A computer program for the static analysis of a current meter mooring has been developed to help oce...
This report establishes an industry knowledge base for existing anchoring and mooring techniques as ...
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1981.MICROFICHE CO...
The original hydraulic system controlling the SeaSoar owned by Geophysical Institute, University of ...
The following topics are summarized for the 2nd quarter of 2000: (1) We amended the structural desig...
The main conclusions from the work carried out under this contract are: An ordinary seafarer can lea...
The division of Electricity at Uppsala University runs a project called Lysekil project, they have d...
Mooring system analysis and evaluation requires the establishing of design criteria and operational ...
This report covers the techniques of deploying and recovering the moorings used by the Buoy Project ...
Master's thesis in Offshore TechnologyDue to the extension of the Gullfaks license, Statoil needs to...
Basic criteria and planning guidelines for the design of fleet moorings are presented for use by qua...
The Woods Hole Oceanographic Institution Buoy Group's field work for the international POLYMODE pro...
Results are presented from previous investigations of three different versions of latching-controlle...
This study consists of a literature review of various types of moored buoy systems. Depending on its...
The physical principle that governs how ships are moored to a port has changed little over the years...
A computer program for the static analysis of a current meter mooring has been developed to help oce...
This report establishes an industry knowledge base for existing anchoring and mooring techniques as ...
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1981.MICROFICHE CO...
The original hydraulic system controlling the SeaSoar owned by Geophysical Institute, University of ...