Sludge samples from the Hanford K East Basin were analyzed by the Toxicity Characterization Leaching Procedure (TCLP) to assist in the appropriate Resource Conservation and Recovery Act (RCIL4) designation of this material. Sludge samples were collected by Fluor Hanford, Inc. using the consolidated sludge sampling system (system that allows collection of a single sample from multiple sample locations). These samples were shipped to the Postirradiation Testing Laboratory (PTL, 327 Building) and then transferred to the Pacific Northwest National Laboratory (PNNL) Radiochemical Processing Laboratory (RPL, 325 Building) for recovery and testing. Two sludge composites were prepared, using the consolidated sludge samples, to represent K East cani...
A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
One of the greatest challenges facing the Department of Energy (DOE) is the remediation of the 100 m...
This report contains results from TCLP preparation and analysis of K East Basin floor and canister c...
This report describes results from analyses performed to characterize the consolidated sludge sample...
Samples of sludge were collected from the K East fuel storage basin (KE Basin) floor, contiguous pit...
Approximately 73 m{sup 3} of heterogeneous solid material, ''sludge,'' (upper bound estimate, Packer...
This report describes results of work performed in the Shielded Analytical Laboratory (SAL) at the P...
This data package contains the K Basin sludge characterization results obtained by Pacific Northwest...
This report describes work performed by Pacific Northwest National Laboratory (PNNL) for Numatec Han...
The toxicity characteristic leaching procedure (TCLP) is one test used by the U.S. Environmental Pro...
An Envelope D Tank 241-C-106 sample was characterized for solids, elemental, and radioactive isotope...
Approximately 73 m{sup 3} of heterogeneous solid material, ''sludge,'' (upper bound estimate, Packer...
A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 Ext...
This data package presents sampling data and analytical results from the September 22 and 27, 1999, ...
A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
One of the greatest challenges facing the Department of Energy (DOE) is the remediation of the 100 m...
This report contains results from TCLP preparation and analysis of K East Basin floor and canister c...
This report describes results from analyses performed to characterize the consolidated sludge sample...
Samples of sludge were collected from the K East fuel storage basin (KE Basin) floor, contiguous pit...
Approximately 73 m{sup 3} of heterogeneous solid material, ''sludge,'' (upper bound estimate, Packer...
This report describes results of work performed in the Shielded Analytical Laboratory (SAL) at the P...
This data package contains the K Basin sludge characterization results obtained by Pacific Northwest...
This report describes work performed by Pacific Northwest National Laboratory (PNNL) for Numatec Han...
The toxicity characteristic leaching procedure (TCLP) is one test used by the U.S. Environmental Pro...
An Envelope D Tank 241-C-106 sample was characterized for solids, elemental, and radioactive isotope...
Approximately 73 m{sup 3} of heterogeneous solid material, ''sludge,'' (upper bound estimate, Packer...
A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 Ext...
This data package presents sampling data and analytical results from the September 22 and 27, 1999, ...
A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
One of the greatest challenges facing the Department of Energy (DOE) is the remediation of the 100 m...