This report summarizes the field and laboratory efforts as a result of the Bear Creek Floodplain Hot Spot Removal Project Early Action. The purpose of this project was to collect data necessary to assess contaminant levels in the Bear Creek Valley Floodplain and evaluate the risk posed by the sites. This report provides information on the background of the site, characterization of site and field activities, results of field and laboratory data collected, extent and distribution of contamination, and an assessment of the future risk posed by the site
A seepage investigation was conducted of 4,600 acres of Bear Creek Valley southwest of the Y-12 Plan...
The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and g...
A study was undertaken of the Oil Landfarm and Burial Grounds A and B, which are three disposal site...
The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Rid...
A treatability study is being performed to investigate the practicability of using passive, in situ ...
This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approa...
This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approa...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
A study was conducted, to delineate stream reaches that were gaining flow, losing flow, or that were...
A treatability study is being conducted to support implementation:of early actions at the S-3 Site i...
This report on the BCV OU 2 at the Y-12 Plant, was prepared in accordance with requirements under th...
The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining po...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining po...
A seepage investigation was conducted of 4,600 acres of Bear Creek Valley southwest of the Y-12 Plan...
The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and g...
A study was undertaken of the Oil Landfarm and Burial Grounds A and B, which are three disposal site...
The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Rid...
A treatability study is being performed to investigate the practicability of using passive, in situ ...
This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approa...
This Sampling and Analysis Plan (SAP) for the Bear Creek Valley (BCV) Floodplain presents the approa...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
A study was conducted, to delineate stream reaches that were gaining flow, losing flow, or that were...
A treatability study is being conducted to support implementation:of early actions at the S-3 Site i...
This report on the BCV OU 2 at the Y-12 Plant, was prepared in accordance with requirements under th...
The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining po...
This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evalua...
The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining po...
A seepage investigation was conducted of 4,600 acres of Bear Creek Valley southwest of the Y-12 Plan...
The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and g...
A study was undertaken of the Oil Landfarm and Burial Grounds A and B, which are three disposal site...