A description is provided of a systematic approach currently being developed and deployed at the Department of Energy to obtain assurance that post-operational activities at nuclear facilities will be conducted in a safe manner. Using this approach, personnel will have available a formalized set of safety principles and associated question sets to assist them in the conducting of safety assessments and surveillance. Information gathered through this means will also be analyzed to determine if there are any generic complex-wide strengths or deficiencies associated with decommissioning activities and to which attention should be drawn
Nuclear explosive assembly/disassembly operations that are carried out under United States Departmen...
This paper summarizes the nuclear explosive hazard assessment activities performed to support US Dep...
This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following com...
The US Department of Energy (DOE) is responsible for nearly 1000 nuclear facilities which will event...
This report records the position of the WPDD on the safety of decommissioning and the task for provi...
Considering that nuclear power plants have a licensed lifetime, the need for research on decommissio...
Decommissioning activities enable the DOE to reuse all or part of a facility for future activities a...
Nuclear power plants have a licensed lifetime. Nowadays, as the number of globally aged nuclear powe...
In nuclear power plant decommissioning, it is essential to reduce radioactive waste while, in the re...
The U. S. Department of Energy (DOE) has recognized that safety assurance requires a balance of inst...
The U. S. Department of Energy (DOE) has recognized that safety assurance requires a balance of inst...
A title that critically reviews the decommissioning and decontamination processes and technologies a...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
Nuclear explosive assembly/disassembly operations that are carried out under United States Departmen...
This paper summarizes the nuclear explosive hazard assessment activities performed to support US Dep...
This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following com...
The US Department of Energy (DOE) is responsible for nearly 1000 nuclear facilities which will event...
This report records the position of the WPDD on the safety of decommissioning and the task for provi...
Considering that nuclear power plants have a licensed lifetime, the need for research on decommissio...
Decommissioning activities enable the DOE to reuse all or part of a facility for future activities a...
Nuclear power plants have a licensed lifetime. Nowadays, as the number of globally aged nuclear powe...
In nuclear power plant decommissioning, it is essential to reduce radioactive waste while, in the re...
The U. S. Department of Energy (DOE) has recognized that safety assurance requires a balance of inst...
The U. S. Department of Energy (DOE) has recognized that safety assurance requires a balance of inst...
A title that critically reviews the decommissioning and decontamination processes and technologies a...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
International audienceThe Decontamination and Decommissioning (DandD) of Licensed Nuclear facilities...
Nuclear explosive assembly/disassembly operations that are carried out under United States Departmen...
This paper summarizes the nuclear explosive hazard assessment activities performed to support US Dep...
This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following com...