The Consolidated Incineration Facility (CIF) is located on the Savannah River Site (SRS), owned by the U. S. Department of Energy and managed by BNFL, Inc. for the Westinghouse Savannah River Company. SRS received permits from the South Carolina Department of Health and Environmental Control (SCDHEC) and the U. S. Environmental Protection Agency (EPA), Region IV to construct and operate the CIF, a hazardous, radioactive mixed waste incinerator. This paper presents the results of the trial burn conducted on the CIF in April 1997 which is the initial demonstration of compliance with the permits. The incinerator is currently operating under approved post-trial burn conditions while the trial burn results are being evaluated. A final operating ...
The Consolidated Incinerator Facility (CIF) at the Savannah River Site (SRS) burns low-level radioac...
The pilot incinerator was built and operated successfully at design throughput with simulated wastes...
A laboratory-scale incinerator (0.5 kg waste/hr) was built and operated for more than 18 months as p...
The Savannah River Technology Center (SRTC) is Providing technical support for start-up and operatio...
A Consolidated Incineration Facility (CIF) is in final design for construction at the Savannah River...
This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be...
This paper describes the successes and challenges associated with Resource Conservation and Recovery...
Start-up testing of a new mixed waste incinerator, the Consolidated Incineration Facility (CIF), has...
One of the methods proposed by the U.S. Department of Energy (DOE) for the volume reduction and stab...
The Consolidated Incinerator Facility (CIF) at the Savannah River Site (SRS) burns low-level radioac...
The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National...
In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Co...
Under the requirements of the Federal Facility Compliance Act (FFCA), the Department of Energy (DOE)...
The Consolidated Incineration Facility (CIF) at the Savannah River Site is designed to treat solid a...
The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort...
The Consolidated Incinerator Facility (CIF) at the Savannah River Site (SRS) burns low-level radioac...
The pilot incinerator was built and operated successfully at design throughput with simulated wastes...
A laboratory-scale incinerator (0.5 kg waste/hr) was built and operated for more than 18 months as p...
The Savannah River Technology Center (SRTC) is Providing technical support for start-up and operatio...
A Consolidated Incineration Facility (CIF) is in final design for construction at the Savannah River...
This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be...
This paper describes the successes and challenges associated with Resource Conservation and Recovery...
Start-up testing of a new mixed waste incinerator, the Consolidated Incineration Facility (CIF), has...
One of the methods proposed by the U.S. Department of Energy (DOE) for the volume reduction and stab...
The Consolidated Incinerator Facility (CIF) at the Savannah River Site (SRS) burns low-level radioac...
The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National...
In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Co...
Under the requirements of the Federal Facility Compliance Act (FFCA), the Department of Energy (DOE)...
The Consolidated Incineration Facility (CIF) at the Savannah River Site is designed to treat solid a...
The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort...
The Consolidated Incinerator Facility (CIF) at the Savannah River Site (SRS) burns low-level radioac...
The pilot incinerator was built and operated successfully at design throughput with simulated wastes...
A laboratory-scale incinerator (0.5 kg waste/hr) was built and operated for more than 18 months as p...