In the fourth quarter of calendar year 1996, 15 days of combust boiler tests were performed, including 10 days of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days to the end of December in the task 5 effort to 57, increased to 65 as of the date of this Report, 1/27/97. This compares with a total of 63 test days needed to complete the task 5 test effort, and it completes the number of tests days required to meet the task 5 project plan. The key project objectives of the areas of combustor performance and environmental performance have been exceeded. With sorbent inj...
Based on studies that indicated a large potential for significantly increased coal-firing in the com...
Coal Tech Corp's mission is to develop, license & sell innovative, lowest cost, solid fuel fired pow...
A coal-water slurry fuel (CWSF) program is being undertaken to determine if CWSFs prepared from clea...
In the fourth quarter of calendar year 1996, 15 days of combust-boiler tests were performed, includi...
In the first quarter of calendar year 1997, 17 days of combustor- boiler tests were performed, inclu...
In the second quarter of calendar year 1997, 9 days of combustor- boiler tests were performed, inclu...
In the second quarter of calendar year 1996, 16 days of combust- boiler tests were performed, includ...
In the third quarter of calendar year 1996, 13 days of combust-boiler tests were performed, includin...
In the fourth quarter of calendar year 1997, 11 days of tests on the 20 MMBtu/hr combustor-boiler fa...
The primary objective of the present Phase 3 effort is to perform the final testing, at a 20 MMBtu/h...
In the second half of calendar year 1998, no work was performed on the present project. The 20 MMBtu...
In the first quarter of calendar year 1996, 9 days of combust-boiler tests were performed. Between t...
In the fourth quarter of calendar year 1995 the installation and checkout of the 20 MMBtu/hr combust...
The present report is a summary of the activities in February and March 1995. The primary activities...
The objective of this program is to demonstrate the technical and economic viability of a coal-fired...
Based on studies that indicated a large potential for significantly increased coal-firing in the com...
Coal Tech Corp's mission is to develop, license & sell innovative, lowest cost, solid fuel fired pow...
A coal-water slurry fuel (CWSF) program is being undertaken to determine if CWSFs prepared from clea...
In the fourth quarter of calendar year 1996, 15 days of combust-boiler tests were performed, includi...
In the first quarter of calendar year 1997, 17 days of combustor- boiler tests were performed, inclu...
In the second quarter of calendar year 1997, 9 days of combustor- boiler tests were performed, inclu...
In the second quarter of calendar year 1996, 16 days of combust- boiler tests were performed, includ...
In the third quarter of calendar year 1996, 13 days of combust-boiler tests were performed, includin...
In the fourth quarter of calendar year 1997, 11 days of tests on the 20 MMBtu/hr combustor-boiler fa...
The primary objective of the present Phase 3 effort is to perform the final testing, at a 20 MMBtu/h...
In the second half of calendar year 1998, no work was performed on the present project. The 20 MMBtu...
In the first quarter of calendar year 1996, 9 days of combust-boiler tests were performed. Between t...
In the fourth quarter of calendar year 1995 the installation and checkout of the 20 MMBtu/hr combust...
The present report is a summary of the activities in February and March 1995. The primary activities...
The objective of this program is to demonstrate the technical and economic viability of a coal-fired...
Based on studies that indicated a large potential for significantly increased coal-firing in the com...
Coal Tech Corp's mission is to develop, license & sell innovative, lowest cost, solid fuel fired pow...
A coal-water slurry fuel (CWSF) program is being undertaken to determine if CWSFs prepared from clea...