This Class II field project has demonstrated that economic quantities of hydrocarbons can be produced from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. The site selected for the demonstration horizontal well was Crystal Field, a nearly abandoned Dundee oil field in Montcalm County, Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well, the TOW 1-3, drilled as a field demonstration pilot was successful, producing at rate of 100 bbls of oil per day with a...
This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellant...
This annual report describes progress during the third year of the project entitled ''Improved Oil R...
This report describes progress during the third year of the project entitled ''Improved Oil Recovery...
The principal objective of this project is to demonstrate the feasibility and economic success of pr...
This Class 11 field project has demonstrated that economic quantities of hydrocarbons can be produce...
The principal objective of this project is to demonstrate the feasibility and economic success of pr...
The principal objective of this project is to demonstrate the feasibility and economics success of p...
Total hydrocarbon production in the Michigan Basin has surpassed 1 billion barrels (Bbbls) and total...
Crystal Field in Montcalm County, MI, was selected as a field trial site for this project. Analysis ...
Well data, including drillers` logs, wireline logs, and seismic data, from the Crystal and 3 0 other...
The objective of this project is to consider the enhanced recovery of petroleum from the Dundee Form...
This report describes well drilling and logging activities performed at Crystal Field. Progress on r...
The goal of this project was to develop and execute a novel drilling and completion program in the A...
Horizontal technology has been applied in over 110 formations in the USA. Volume 1 of this study add...
Horizontal technology has been applied in over 110 formations in the USA. Volume I of this study add...
This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellant...
This annual report describes progress during the third year of the project entitled ''Improved Oil R...
This report describes progress during the third year of the project entitled ''Improved Oil Recovery...
The principal objective of this project is to demonstrate the feasibility and economic success of pr...
This Class 11 field project has demonstrated that economic quantities of hydrocarbons can be produce...
The principal objective of this project is to demonstrate the feasibility and economic success of pr...
The principal objective of this project is to demonstrate the feasibility and economics success of p...
Total hydrocarbon production in the Michigan Basin has surpassed 1 billion barrels (Bbbls) and total...
Crystal Field in Montcalm County, MI, was selected as a field trial site for this project. Analysis ...
Well data, including drillers` logs, wireline logs, and seismic data, from the Crystal and 3 0 other...
The objective of this project is to consider the enhanced recovery of petroleum from the Dundee Form...
This report describes well drilling and logging activities performed at Crystal Field. Progress on r...
The goal of this project was to develop and execute a novel drilling and completion program in the A...
Horizontal technology has been applied in over 110 formations in the USA. Volume 1 of this study add...
Horizontal technology has been applied in over 110 formations in the USA. Volume I of this study add...
This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellant...
This annual report describes progress during the third year of the project entitled ''Improved Oil R...
This report describes progress during the third year of the project entitled ''Improved Oil Recovery...