Balance of 13 fuel assemblies for the Climax programs were received; 9 were completely encapsulated, 4 were canistered without welding; all were placed in Hot Bay lag storage. Six Climax electrically heated mockup assemblies (EHMA) were pre-assembled at E-MAD, delivered to the Climax site and assembly was completed. The BWR fuel handling tool was fabricated and proof tested. The new constant air monitor (CAM) equipment was received. Fuel Temperature Test controller modifications were completed and testing was resumed. Calorimeter equipment installation was resumed; modification of lower vertical supports was completed; and the first review draft of the operating procedure was issued. The Lag Storage Pit ventilation test was completed
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the...
The following was completed: calorimeter equipment modification, installation, calibration and check...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
In 1977 the Spent Fuel Handling and Packaging Program (SFHPP) was initiated by the Department of Ene...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
From March 1978 through March 1982, spent fuel dry storage tests were conducted at the Engine Mainte...
A spent fuel Isolated Drywell Test was conducted at the Engine-Maintenance, Assembly and Disassembly...
This report summarizes the histories of 17 Zircaloy-clad spent fuel assemblies used in dry storage t...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
The Spent Fuel Test - Climax (SFT-C) is a test of the retrievable, deep geologic storage of commerci...
Support was provided to DOE/NV during preparation of a proposal, requested by the DOE San Francisco ...
In the Climax stock granite on the Nevada Test Site, eleven canisters of spent nuclear reactor fuel ...
A PWR spent fuel assembly was encapsulated inside the E-MAD Hot Bay and placed in a instrumented abo...
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the...
The following was completed: calorimeter equipment modification, installation, calibration and check...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
In 1977 the Spent Fuel Handling and Packaging Program (SFHPP) was initiated by the Department of Ene...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
From March 1978 through March 1982, spent fuel dry storage tests were conducted at the Engine Mainte...
A spent fuel Isolated Drywell Test was conducted at the Engine-Maintenance, Assembly and Disassembly...
This report summarizes the histories of 17 Zircaloy-clad spent fuel assemblies used in dry storage t...
This document is a report of activities performed by Westinghouse Advanced Energy Systems Division-N...
The Spent Fuel Test - Climax (SFT-C) is a test of the retrievable, deep geologic storage of commerci...
Support was provided to DOE/NV during preparation of a proposal, requested by the DOE San Francisco ...
In the Climax stock granite on the Nevada Test Site, eleven canisters of spent nuclear reactor fuel ...
A PWR spent fuel assembly was encapsulated inside the E-MAD Hot Bay and placed in a instrumented abo...
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on t...
The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the...