External direct surveys were performed for elevated {gamma} levels with a PG2 portable detector connected to a PRM 5-3 meter and for elevated {alpha} and {beta} levels with an NE portable detector. No {gamma} activity above background was detected. Several locations, the floor and west wall of building 579 and the manhole, had low levels of {beta} activity, up to 87 {+-} 49 dis/min. These values are below the allowable residual surface contamination limits for removable beta activity. There is water in the Mixed Bed Exchange Vessel, the Cation Exchange Vessel, the Closed Drain Tank, the manhole and some of the pipes. The accessible internal surfaces of the pipes, tanks and columns had higher levels of {beta} activity up to 172 {+-} 52 dis/m...
At 100-H Area there are 13 locations and at 100-F Area 16 locations where radioactive material was d...
Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO ...
Radiological characterization and monitoring is an important component of environmental management a...
The Building 594 D&D Project was directed toward the following goals: Removal of any radioactive...
As part of the Formerly Utilized Sites Remedial Action Program, a team from Oak Ridge National Labor...
The March 1979 accident at General Public Utilities Nuclear Corporation (GPUNC) Three Mile Island Nu...
As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laborat...
The 327 Building Post Irradiation Testing Laboratory is used for temporary storage and for destructi...
The post-remedial-action radiological assessment conducted by the ANL Radiological Survey Group in O...
This report contains the results of surveys of the current radiological condition of the Building Si...
The purpose of this project was to determine the performance of the solid low-level radioactive wast...
A radiological survey was conducted in a portion of Building 22 at the Washington Navy Yard, Washing...
The Health Physics Section of ANL performed a characterization of the Building 310 Service Floor Ret...
>One of the objectives of the Waste Management Program is to separate the long-lived heat emitter /a...
At the request of the USDOE, a team from ORNL conducted an independent radiological verification sur...
At 100-H Area there are 13 locations and at 100-F Area 16 locations where radioactive material was d...
Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO ...
Radiological characterization and monitoring is an important component of environmental management a...
The Building 594 D&D Project was directed toward the following goals: Removal of any radioactive...
As part of the Formerly Utilized Sites Remedial Action Program, a team from Oak Ridge National Labor...
The March 1979 accident at General Public Utilities Nuclear Corporation (GPUNC) Three Mile Island Nu...
As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laborat...
The 327 Building Post Irradiation Testing Laboratory is used for temporary storage and for destructi...
The post-remedial-action radiological assessment conducted by the ANL Radiological Survey Group in O...
This report contains the results of surveys of the current radiological condition of the Building Si...
The purpose of this project was to determine the performance of the solid low-level radioactive wast...
A radiological survey was conducted in a portion of Building 22 at the Washington Navy Yard, Washing...
The Health Physics Section of ANL performed a characterization of the Building 310 Service Floor Ret...
>One of the objectives of the Waste Management Program is to separate the long-lived heat emitter /a...
At the request of the USDOE, a team from ORNL conducted an independent radiological verification sur...
At 100-H Area there are 13 locations and at 100-F Area 16 locations where radioactive material was d...
Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO ...
Radiological characterization and monitoring is an important component of environmental management a...