This analysis estimates the radiation dose to the equipment that will be submerged in double-shell tank waste. The results of this analysis are intended to be the basis for specifications for in-tank equipment. The scope of this analysis is limited to the new equipment required for the delivery of waste feed to Phase 1 private contractors. Phase 1 refers to the first of a two-phase plan to privatize the remediation of Hanford`s tank waste. The focus of this analysis is on waste feed delivery because of the extraordinarily high cost of any failure that would lead to the interruption of a steady flow of feed to the private contractors
Waste characterization efforts for underground single-shell tanks (SSTs) containing chemical and rad...
The document presents updated results of the preliminary reliability, availability, maintainability ...
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness...
This document provides a documented basis for the required design pressure rating and pump pressure ...
The ''Initial Single-Shell Tank System Performance Assessment for the Hanford Site [1] (SST PA) pres...
Treatment and disposition of Hanford Site waste as currently planned consists of I 00+ waste retriev...
Under the Hanford Site Tank Waste Remediation System (TWRS) privatization strategy, the US Departmen...
Radioactive waste has been stored in large underground storage tanks at the Hanford Site since 1944....
The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioacti...
The U.S. Department of Energy (DOE) is currently planning to retrieve, pretreat, immobilize and safe...
This report presents the updated results of the preliminary reliability, availability, and maintaina...
This document describes the range of environmental actions, including required permits and other age...
The program to treat and dispose of the highly radioactive wastes stored in underground tanks at the...
The Phase 1 privatization contracts require that the Project Hanford Management Contract (PHMC) cont...
Radioactive wastes have been stored in large underground tanks at Hanford since 1944. In 1991, The T...
Waste characterization efforts for underground single-shell tanks (SSTs) containing chemical and rad...
The document presents updated results of the preliminary reliability, availability, maintainability ...
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness...
This document provides a documented basis for the required design pressure rating and pump pressure ...
The ''Initial Single-Shell Tank System Performance Assessment for the Hanford Site [1] (SST PA) pres...
Treatment and disposition of Hanford Site waste as currently planned consists of I 00+ waste retriev...
Under the Hanford Site Tank Waste Remediation System (TWRS) privatization strategy, the US Departmen...
Radioactive waste has been stored in large underground storage tanks at the Hanford Site since 1944....
The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioacti...
The U.S. Department of Energy (DOE) is currently planning to retrieve, pretreat, immobilize and safe...
This report presents the updated results of the preliminary reliability, availability, and maintaina...
This document describes the range of environmental actions, including required permits and other age...
The program to treat and dispose of the highly radioactive wastes stored in underground tanks at the...
The Phase 1 privatization contracts require that the Project Hanford Management Contract (PHMC) cont...
Radioactive wastes have been stored in large underground tanks at Hanford since 1944. In 1991, The T...
Waste characterization efforts for underground single-shell tanks (SSTs) containing chemical and rad...
The document presents updated results of the preliminary reliability, availability, maintainability ...
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness...