A 500 cubic foot per minute (CFM) portable exhauster system was fabricated for use on 241-A-101 [a Hydrogen Watch List tank] during saltwell pumping activities. An operational test was performed on this unit during 9/20/96 through 1O/14/96 in the 241-A Tank Farm. This operational test was done in accordance with OTP-060-001 Rev 0 (See Appendix A of this report). The test was performed with exceptions
This document serves as a notice of construction (NOC), pursuant to the requirements of Washington A...
This document is a plan for testing four different flow meters for use in the primary exhaust ventil...
This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includ...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-006 to be used for saltwell pumpin...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-005 to be used for saltwell pumpin...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-004 to be used for saltwell pumpin...
500 cfm portable exhausters will be utilized on single shell tanks involved in saltwell pumping. Thi...
Exhausters will be employed to ventilate certain single-shell tanks (SSTs) during salt well pumping ...
Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System ...
The 241-A-101 tank, a 22.9 meter 3,785,400 liter capacity SST, was constructed from the fourth gener...
This document defines functional requirements for portable exhausters used to ventilate primary tank...
This document reports the results of testing four different flowmeters for use in the primary exhaus...
This document serves as a notice of construction (NOC), pursuant to the requirements of Washington A...
This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (...
This document serves as a notice of construction (NOC) for the use of a portable exhauster on 241-A-...
This document serves as a notice of construction (NOC), pursuant to the requirements of Washington A...
This document is a plan for testing four different flow meters for use in the primary exhaust ventil...
This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includ...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-006 to be used for saltwell pumpin...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-005 to be used for saltwell pumpin...
This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-004 to be used for saltwell pumpin...
500 cfm portable exhausters will be utilized on single shell tanks involved in saltwell pumping. Thi...
Exhausters will be employed to ventilate certain single-shell tanks (SSTs) during salt well pumping ...
Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System ...
The 241-A-101 tank, a 22.9 meter 3,785,400 liter capacity SST, was constructed from the fourth gener...
This document defines functional requirements for portable exhausters used to ventilate primary tank...
This document reports the results of testing four different flowmeters for use in the primary exhaus...
This document serves as a notice of construction (NOC), pursuant to the requirements of Washington A...
This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (...
This document serves as a notice of construction (NOC) for the use of a portable exhauster on 241-A-...
This document serves as a notice of construction (NOC), pursuant to the requirements of Washington A...
This document is a plan for testing four different flow meters for use in the primary exhaust ventil...
This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includ...