Washington Administration Code 173-303-300 requires that a waste analysis plan (WAP) be provided by a treatment, storage, and/or disposal (TSD) unit to confirm their knowledge about a dangerous and/or mixed waste to ensure that the waste is managed properly. The specific objectives of the WAP are as follows: Ensure safe management of waste during treatment and storage; Ensure that waste generated during operational activities is properly designated in accordance with regulatory requirements; Provide chemical and physical analysis of representative samples of the waste stored for characterization and/or verification before the waste is transferred to another TSD unit; Ensure compliance with land disposal restriction (LDR) requirements for tr...
The Department of Energy (DOE) is preparing for disposal operations at the Waste Isolation Pilot Pla...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...
The following provides a summary of the specific issues addressed in this FY-95 Annual Update as the...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
The purpose of this waste analysis plan (WAP) is to document waste analysis activities associated wi...
This waste analysis plan (WAP) has been prepared for the Central Waste Complex which is located in t...
Washington Administrative Code 173-303-300 requires that a facility develop and follow a written was...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
This waste analysis plan (WAP) has been prepared for startup of the 200 Area Effluent Treatment Faci...
Washington Administrative Code 173-303-300 requires that a facility develop and follow a written was...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
This Waste Analysis Plan (WAP) provides the plan for obtaining information needed for proper waste h...
This waste analysis plan (WAP) has been prepared for the Low-Level Burial Grounds that are located i...
The purpose of this waste analysis plan (WAP) is to document the waste 5 acceptance process, samplin...
This Contingency Plan identifies personnel responsibilities, emergency equipment, and required actio...
The Department of Energy (DOE) is preparing for disposal operations at the Waste Isolation Pilot Pla...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...
The following provides a summary of the specific issues addressed in this FY-95 Annual Update as the...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
The purpose of this waste analysis plan (WAP) is to document waste analysis activities associated wi...
This waste analysis plan (WAP) has been prepared for the Central Waste Complex which is located in t...
Washington Administrative Code 173-303-300 requires that a facility develop and follow a written was...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
This waste analysis plan (WAP) has been prepared for startup of the 200 Area Effluent Treatment Faci...
Washington Administrative Code 173-303-300 requires that a facility develop and follow a written was...
The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling ...
This Waste Analysis Plan (WAP) provides the plan for obtaining information needed for proper waste h...
This waste analysis plan (WAP) has been prepared for the Low-Level Burial Grounds that are located i...
The purpose of this waste analysis plan (WAP) is to document the waste 5 acceptance process, samplin...
This Contingency Plan identifies personnel responsibilities, emergency equipment, and required actio...
The Department of Energy (DOE) is preparing for disposal operations at the Waste Isolation Pilot Pla...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...
The following provides a summary of the specific issues addressed in this FY-95 Annual Update as the...