Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity
In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System...
In 2011, significant progress was made in developing and deploying technologies to remove, transport...
Single-shell W C-106 is on an accelerated schedule for partial retrieval of its softer, high-he-at s...
Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,...
Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,...
This report documents operational controls to be incorporated into the Process Control Plan for Proj...
The purpose of this document is to provide a readily available source of the technical reports neede...
Retrieval of waste from single-shell tank C-110 resumed in January making it the first waste retriev...
This Project Management Plan establishes the organization, plans, and systems for management of Proj...
This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 duri...
This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 duri...
The calculations contained in this analysis document establish the technical basis for the volume, f...
Wastes stored in Hanford Tank 241-SY-102 are planned to be retrieved from that tank and transferred ...
The Hanford Tank Farms contain 53 million gal of radioactive waste accumulated during over 50 years ...
The sluicer test report documents the results of the Project W-320 factory testing conducted at the ...
In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System...
In 2011, significant progress was made in developing and deploying technologies to remove, transport...
Single-shell W C-106 is on an accelerated schedule for partial retrieval of its softer, high-he-at s...
Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,...
Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,...
This report documents operational controls to be incorporated into the Process Control Plan for Proj...
The purpose of this document is to provide a readily available source of the technical reports neede...
Retrieval of waste from single-shell tank C-110 resumed in January making it the first waste retriev...
This Project Management Plan establishes the organization, plans, and systems for management of Proj...
This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 duri...
This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 duri...
The calculations contained in this analysis document establish the technical basis for the volume, f...
Wastes stored in Hanford Tank 241-SY-102 are planned to be retrieved from that tank and transferred ...
The Hanford Tank Farms contain 53 million gal of radioactive waste accumulated during over 50 years ...
The sluicer test report documents the results of the Project W-320 factory testing conducted at the ...
In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System...
In 2011, significant progress was made in developing and deploying technologies to remove, transport...
Single-shell W C-106 is on an accelerated schedule for partial retrieval of its softer, high-he-at s...