An overview of the TA-55, Building PF-4 ventilation system is provided in the following sections. Included are descriptions of the zone configurations, equipment-performance criteria, ventilation support systems, and the ventilation-system evaluation criteria. Section 4.2.1.1 provides a brief discussion of the ventilation system function. Section 4.2.1.2 provides details on the overall system configuration. Details of system interfaces and support systems are provided in Section 4.2.1.3. Section 4.2.1.4 describes instrumentation and control needed to operate the ventilation system. Finally, Sections 4.2.1.5 and 4.2.1.6 describe system surveillance/maintenance and Technical Safety Requirements (TSR) Limitations, respectively. Note that the n...
This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventil...
This report describes the modifications to the ventilation system for the Plutonium Finishing Plant....
The Plutonium Finishing Plant (PFP) WAC System includes sub-systems 25A through 25K. Specific system...
The ASB reviews the turbine area ventilation system (TAVS) from air intake to the point of discharge...
This report provides the technical basis for high efficiency particulate air filter (HEPA) for Hanfo...
An introduction to ventilation system terminology, attachment types, and aspects to consider when se...
NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility...
The waste tank purge ventilation system for Tank 48 is designed to prevent dangerous concentrations ...
This report is a collection and review of system operation and failure experiences for air ventilati...
This section comprises the diesel generator building ventilation system (with warm moist air as the ...
This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. P...
Details are given for methods of test and the requirements for powered smoke and heat control ventil...
The Waste Treatment Building Ventilation System provides heating, ventilation, and air conditioning ...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The Subsurface Ventilation System supports the construction and operation of the subsurface reposito...
This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventil...
This report describes the modifications to the ventilation system for the Plutonium Finishing Plant....
The Plutonium Finishing Plant (PFP) WAC System includes sub-systems 25A through 25K. Specific system...
The ASB reviews the turbine area ventilation system (TAVS) from air intake to the point of discharge...
This report provides the technical basis for high efficiency particulate air filter (HEPA) for Hanfo...
An introduction to ventilation system terminology, attachment types, and aspects to consider when se...
NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility...
The waste tank purge ventilation system for Tank 48 is designed to prevent dangerous concentrations ...
This report is a collection and review of system operation and failure experiences for air ventilati...
This section comprises the diesel generator building ventilation system (with warm moist air as the ...
This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. P...
Details are given for methods of test and the requirements for powered smoke and heat control ventil...
The Waste Treatment Building Ventilation System provides heating, ventilation, and air conditioning ...
The ASB reviews the auxiliary and radwaste area ventilation system (ARAVS) from air intake to the po...
The Subsurface Ventilation System supports the construction and operation of the subsurface reposito...
This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventil...
This report describes the modifications to the ventilation system for the Plutonium Finishing Plant....
The Plutonium Finishing Plant (PFP) WAC System includes sub-systems 25A through 25K. Specific system...