During this period work was continued on analyzing the use of the shield for the thermal energy storage in the PULSAR reactor design and it was found that this design approach was also applicable to the Li-self-cooled V-alloy structure blanket option. The ARIES-IV toroidal blanket final report was completed. The conceptual design for a 2in x 8in distributed gyrotron window was completed and long lead parts are on order. A dedicated DiMES experiment was successfully run in DIII-D. Useful material erosion and redeposition results were obtained and input for modeling analysis
Recent fusion power plant design studies in the US have been conducted within the ARIES project. The...
During this period, the ARIES-I blanket design team completed the preparation of the ARIES-I reactor...
AbstractITER is a large experimental tokamak being built to research fusion power. The ITER cryostat...
During this quarter all technical work and documentation of the PULSAR design was completed. They al...
Work continued on the development of the high-pressure helium-cooled design for the PULSAR reactor s...
The ARIES-I design is nearing completion. The ARIES-II design work will begin soon and will be based...
A scoping level analysis of heat exhaust for the DEMO divertor strawman design was performed. It was...
During this period, the ARIES-I blanket design team has concentrated its efforts on preparation of t...
Abstract. The ITER L-4 Blanket Project has achieved substantial progress over the last two years. Th...
Highlights of the DIII-D Research Operations are: began experimental research operations; successful...
The main goals of the DIII-D experiments in 1997 were, by extending and integrating the understandin...
The effort during this performance period focused on a number of TBWG activities (including test mod...
We conducted physics experiments: record normalized {Beta} = 4.9 achieved in VH-mode, {Beta} limits ...
The DIII-D tokamak research program is managed by General Atomics (GA) for the US Department of Ener...
The DIII-D tokamak research program is carried out by, General Atomics (GA) for the U.S. Department ...
Recent fusion power plant design studies in the US have been conducted within the ARIES project. The...
During this period, the ARIES-I blanket design team completed the preparation of the ARIES-I reactor...
AbstractITER is a large experimental tokamak being built to research fusion power. The ITER cryostat...
During this quarter all technical work and documentation of the PULSAR design was completed. They al...
Work continued on the development of the high-pressure helium-cooled design for the PULSAR reactor s...
The ARIES-I design is nearing completion. The ARIES-II design work will begin soon and will be based...
A scoping level analysis of heat exhaust for the DEMO divertor strawman design was performed. It was...
During this period, the ARIES-I blanket design team has concentrated its efforts on preparation of t...
Abstract. The ITER L-4 Blanket Project has achieved substantial progress over the last two years. Th...
Highlights of the DIII-D Research Operations are: began experimental research operations; successful...
The main goals of the DIII-D experiments in 1997 were, by extending and integrating the understandin...
The effort during this performance period focused on a number of TBWG activities (including test mod...
We conducted physics experiments: record normalized {Beta} = 4.9 achieved in VH-mode, {Beta} limits ...
The DIII-D tokamak research program is managed by General Atomics (GA) for the US Department of Ener...
The DIII-D tokamak research program is carried out by, General Atomics (GA) for the U.S. Department ...
Recent fusion power plant design studies in the US have been conducted within the ARIES project. The...
During this period, the ARIES-I blanket design team completed the preparation of the ARIES-I reactor...
AbstractITER is a large experimental tokamak being built to research fusion power. The ITER cryostat...