This paper presents an interesting example of compromise through comprehensive environmental analysis and intensive negotiation to build a coal-fired power plant near an environmentally sensitive area. In December 1993, the US Department of Energy (DOE) completed the final environmental impact statement (EIS) for the Healy clean Coal Project (HCCP), a proposed demonstration project that would be cost- shared by DOE and the Alaska Industrial Development and Export Authority (AIDEA). The HCCP would be built adjacent to the existing coal-fired Golden Valley Electric Association, Inc. (GVEA) Unit No. 1 in Healy, Alaska, about 4 miles north of Denali National Park and Preserve (DNPP). In response to US Department of the Interior (DOI) concerns a...
The current levels of CO2 emissions and high levels accumulating in the atmosphere have climate scie...
Our article on June 28, 2012, discussed a proposed rule by the U.S. Environmental Protection Agency ...
This paper presents a case study of an environmental restoration project at a major mixed waste site...
The objective of the proposed project is to test the technical, environmental, and economic viabilit...
Environmental, political, and economic events seem to conspire simultaneously towards the objective ...
Power generation facilities all over the nation are feeling the stress from increasingly stringent e...
Major Federal actions require National Environmental Policy Act (NEPA) assessments of the environmen...
This EIS assesses environmental issues associated with constructing and demonstrating a project that...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
Community opposition, legal challenges, and financial uncertainty over future carbon costs are promp...
The objectives of the National Coal Utilization Assessment are: Identification of the environmental,...
Abstract: Problem statement: Electricity can be generated from different type of technologies such a...
Correspondence issued by the Government Accountability Office with an abstract that begins "Great Ba...
After President George W. Bush’s National Energy Plan of 2001 encouraged the development of hundreds...
State legislatures and environmental agencies have taken the lead in combating climate change, in th...
The current levels of CO2 emissions and high levels accumulating in the atmosphere have climate scie...
Our article on June 28, 2012, discussed a proposed rule by the U.S. Environmental Protection Agency ...
This paper presents a case study of an environmental restoration project at a major mixed waste site...
The objective of the proposed project is to test the technical, environmental, and economic viabilit...
Environmental, political, and economic events seem to conspire simultaneously towards the objective ...
Power generation facilities all over the nation are feeling the stress from increasingly stringent e...
Major Federal actions require National Environmental Policy Act (NEPA) assessments of the environmen...
This EIS assesses environmental issues associated with constructing and demonstrating a project that...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
Community opposition, legal challenges, and financial uncertainty over future carbon costs are promp...
The objectives of the National Coal Utilization Assessment are: Identification of the environmental,...
Abstract: Problem statement: Electricity can be generated from different type of technologies such a...
Correspondence issued by the Government Accountability Office with an abstract that begins "Great Ba...
After President George W. Bush’s National Energy Plan of 2001 encouraged the development of hundreds...
State legislatures and environmental agencies have taken the lead in combating climate change, in th...
The current levels of CO2 emissions and high levels accumulating in the atmosphere have climate scie...
Our article on June 28, 2012, discussed a proposed rule by the U.S. Environmental Protection Agency ...
This paper presents a case study of an environmental restoration project at a major mixed waste site...