Performance data for July 1995 reflects a 4% unfavorable schedule variance and is an improvement over June 1995. The majority of the behind schedule condition is attributed to EM-30, (Office of Waste Management). The majority of the EM-30 schedule variance is associated with the Tank Waste Remediation System (TWRS) Program. The TWRS schedule variance is attributed to the delay in obtaining key decision 0 (KD-0) for Project W-314, ``Tank Farm Restoration and Safe Operations`` and the Multi-Function Waste Tank Facility (MWTF) workscope still being a part of the baseline. Baseline Change Requests (BCRs) are in process rebaselining Project W-314 and deleting the MWTF from the TWRS baseline. Once the BCR`s are approved and implemented, the overa...
The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmenta...
The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link wit...
In 1989 the Secretary of Energy changed the mission of the Richland Operations Office (ROO) from sup...
This document presents information about the milestones achieved by the Environmental Management pro...
This study documents the results of an assessment of each Hanford program`s potential RH-TRU(M) wast...
The ''Initial Single-Shell Tank System Performance Assessment for the Hanford Site [1] (SST PA) pres...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with ...
River Protection Project (RPP) performance for the month of July 2000 was very good. The most signif...
Cost savings are an integral part of Hanford site operations. Congressional actions towards establis...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remedi...
Characterization Engineering (CE) continues to make progress in support of the project goal of chara...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
Many Waste Minimization/Pollution Prevention successes at the Hanford Site occur every day without f...
The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmenta...
The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link wit...
In 1989 the Secretary of Energy changed the mission of the Richland Operations Office (ROO) from sup...
This document presents information about the milestones achieved by the Environmental Management pro...
This study documents the results of an assessment of each Hanford program`s potential RH-TRU(M) wast...
The ''Initial Single-Shell Tank System Performance Assessment for the Hanford Site [1] (SST PA) pres...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with ...
River Protection Project (RPP) performance for the month of July 2000 was very good. The most signif...
Cost savings are an integral part of Hanford site operations. Congressional actions towards establis...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remedi...
Characterization Engineering (CE) continues to make progress in support of the project goal of chara...
The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL...
Many Waste Minimization/Pollution Prevention successes at the Hanford Site occur every day without f...
The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmenta...
The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link wit...
In 1989 the Secretary of Energy changed the mission of the Richland Operations Office (ROO) from sup...