The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishment of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers th...
The Oak Ridge Y-12 Plant is currently under a Federal Agreement to define soil and groundwater conta...
This annual monitoring report contains groundwater and surface water monitoring data obtained in the...
A treatability study is being conducted to support implementation:of early actions at the S-3 Site i...
This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Pop...
The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Departm...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (OR...
This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report describes activities associated with conducting dry weather surface water sampling of Up...
The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and g...
The Oak Ridge Y-12 Plant is currently under a Federal Agreement to define soil and groundwater conta...
This annual monitoring report contains groundwater and surface water monitoring data obtained in the...
A treatability study is being conducted to support implementation:of early actions at the S-3 Site i...
This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Pop...
The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Departm...
The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reserv...
On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (OR...
This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report presents the findings of an investigation into contamination of the Clinch River and Pop...
This report describes activities associated with conducting dry weather surface water sampling of Up...
The Oak Ridge Y-12 Plant site is currently under a Federal Facilities Agreement to define soil and g...
The Oak Ridge Y-12 Plant is currently under a Federal Agreement to define soil and groundwater conta...
This annual monitoring report contains groundwater and surface water monitoring data obtained in the...
A treatability study is being conducted to support implementation:of early actions at the S-3 Site i...