The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall S...
The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties...
This WG would address 3 issues which relate to the processes, procedures and environmental impact a...
"USDA-REA-EIS (ADM) 80-10-F"--2nd prelim. p."Volume II.""March, 1981."Cover title: Sherburne-Benton ...
The existing switchyards at Western Area Power Administration\u27s (WESTERN) Seminoe and Kortes faci...
The Western Area Power Administration (Western), an agency of the United States Department of Energy...
The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consid...
The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Fla...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. C...
The Western Area Power Administration (Western) is proposing to construct, operate, and maintain a n...
This research states the importance of electrical substations to meet the increasing electrical dem...
Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to...
This environmental assessment (EA) has been prepared to assess potential environmental impacts assoc...
B2 prepared by CA Archaeological Consultants, Inc. in association with Thomas Reid AssociatesMode of...
The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties...
This WG would address 3 issues which relate to the processes, procedures and environmental impact a...
"USDA-REA-EIS (ADM) 80-10-F"--2nd prelim. p."Volume II.""March, 1981."Cover title: Sherburne-Benton ...
The existing switchyards at Western Area Power Administration\u27s (WESTERN) Seminoe and Kortes faci...
The Western Area Power Administration (Western), an agency of the United States Department of Energy...
The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consid...
The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Fla...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. C...
The Western Area Power Administration (Western) is proposing to construct, operate, and maintain a n...
This research states the importance of electrical substations to meet the increasing electrical dem...
Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to...
This environmental assessment (EA) has been prepared to assess potential environmental impacts assoc...
B2 prepared by CA Archaeological Consultants, Inc. in association with Thomas Reid AssociatesMode of...
The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties...
This WG would address 3 issues which relate to the processes, procedures and environmental impact a...
"USDA-REA-EIS (ADM) 80-10-F"--2nd prelim. p."Volume II.""March, 1981."Cover title: Sherburne-Benton ...