16 images. Snark missile, 3 January 1958. Snark missile suspended by cables; missile as it came out of hanger used for final assembly; James Kelley (technician); Ruby Fryman (electronic assembler); Bert Willbaum (technician); James Byers (technician); H.J. Swartz (ground support equipment dept. head); R.L. Lanning (technician); A.B. Adriansen (lead man).; Caption slip reads: "Photographer: Miller. Date: 1958-01-03. Reporter: T. T. Assignment: Snark missile layout. Special instructions: Monday. 216: Photo from roof of Northrop Aircraft plant shows Snark missile as it came out of hangar for final assembly. 5-6-31: Photo shows Snark missile suspended by cables as it is lowered into launching device, which is mobile. 1/2: L to R: H.J. Swartz...