"March 1978."2 folded plans in back cover pocket.Prepared in cooperation with U.S. Office of Waste Isolation.Includes bibliographical references.Mode of access: Internet
Issued Aug. 23, 1977.At head of title: Final environmental impact statement.Cover title.Bibliography...
March-July 1977.EPA contract no. 68-01-4470Includes bibliographical references.v. A. Task A report, ...
"May 1974."Cover title.Includes bibliographical references (p. 67-68).Mode of access: Internet
"DOE/RW-0005""June 1985"Contents: v. 1. Overview and current plans - information required by the Nuc...
Issued Sept. 1978.Contract 68-01-3924.Includes bibliographical references (p. 35-38).Mode of access:...
The objective of the Transportation/Logistics Study is to ensure the availability of a viable system...
Pagination includes "Distribution list" (p. 41-56)."Printed April 1989.""Prepared by Sandia National...
"Date published: July 1978."Prepared under contract no. NRC-02-77-160."NUREG/CR-0032."Includes bibli...
"October, 1963.."Originally prepared for the Atomic Energy Commission."Contract number AT(30-1)1477....
Sept. 1979."NUREG/CR-1005."Includes bibliographical references.Mode of access: Internet
"SAND89-0178.""Printed April 1989.""Prepared by Sandia National Laboratories ... for the United Stat...
Shipping list no.: 91-552-P."A summary of work done in part in cooperation with the U.S. Department ...
Bibliography: 2 p.Prepared for U.S. Department of Transportation, Research and Special Programs Admi...
"Printed by Savannah River Laboratory for the United States Atomic Energy Commission Contract AT(07-...
Printed for the U.S. Atomic Energy Commission contract AT (07-2)--1."DP-341.""Radioactive Waste (TID...
Issued Aug. 23, 1977.At head of title: Final environmental impact statement.Cover title.Bibliography...
March-July 1977.EPA contract no. 68-01-4470Includes bibliographical references.v. A. Task A report, ...
"May 1974."Cover title.Includes bibliographical references (p. 67-68).Mode of access: Internet
"DOE/RW-0005""June 1985"Contents: v. 1. Overview and current plans - information required by the Nuc...
Issued Sept. 1978.Contract 68-01-3924.Includes bibliographical references (p. 35-38).Mode of access:...
The objective of the Transportation/Logistics Study is to ensure the availability of a viable system...
Pagination includes "Distribution list" (p. 41-56)."Printed April 1989.""Prepared by Sandia National...
"Date published: July 1978."Prepared under contract no. NRC-02-77-160."NUREG/CR-0032."Includes bibli...
"October, 1963.."Originally prepared for the Atomic Energy Commission."Contract number AT(30-1)1477....
Sept. 1979."NUREG/CR-1005."Includes bibliographical references.Mode of access: Internet
"SAND89-0178.""Printed April 1989.""Prepared by Sandia National Laboratories ... for the United Stat...
Shipping list no.: 91-552-P."A summary of work done in part in cooperation with the U.S. Department ...
Bibliography: 2 p.Prepared for U.S. Department of Transportation, Research and Special Programs Admi...
"Printed by Savannah River Laboratory for the United States Atomic Energy Commission Contract AT(07-...
Printed for the U.S. Atomic Energy Commission contract AT (07-2)--1."DP-341.""Radioactive Waste (TID...
Issued Aug. 23, 1977.At head of title: Final environmental impact statement.Cover title.Bibliography...
March-July 1977.EPA contract no. 68-01-4470Includes bibliographical references.v. A. Task A report, ...
"May 1974."Cover title.Includes bibliographical references (p. 67-68).Mode of access: Internet