"October 27, 1962.""TID-17887."Prepared by Southern Research Institute, Birmingham, Alabama.Mode of access: Internet
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-3192-MS ; UC-25, Metals, Ceramic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2533 ; Physics ; TID-4500, 16th ...
"Contract W-7405-Eng. 36 with the U.S. Atomic Energy Commission.""Report written: July 1, 1964 ; Rep...
Work performed under Contract No. AT(30-1)-2784 at the Nuclear Metals, Inc."September 17, 1963."Titl...
"NRC FIN B5948.""NUREG/CR-0235."Includes bibliographical references.Mode of access: Internet
"Project no. 7360, Task no. 73603.""Prepared under Contract no. AF 33 (616)-6312, by the Southern Re...
"Materials Central, Contract no. AF 33(616)-6552, Project no. 7381."Mode of access: Internet
"June 10, 1953."Includes bibliographical references (p. 7).Mode of access: Internet
http://deepblue.lib.umich.edu/bitstream/2027.42/4953/5/bac2358.0001.001.pdfhttp://deepblue.lib.umich...
Prepared at Lewis Research Center."April 1969"--Cover.Includes bibliographical references (p. 31).Mo...
"Project No.39, U.S. Atomic Energy Commission, Contract No. AT(04-3)-314.""November 21, 1960."Includ...
"APEX-676 ; UC-25, Metals, Ceramics, and Materials; TID-4500 (16th Ed.)""December 1961."Prepared by ...
U.S. Atomic Energy Commission ;Mode of access: Internet.Description based on: GEMP-3A (July 1, 1961-...
"Issued: April 1, 1957.""NAA-SR-1846 ; Metallurgy and Ceramics."Includes bibliographical references ...
"DATE.""Project No. 7353, Task No. 735301.""June 1962."Includes bibliographical references (page 45)...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-3192-MS ; UC-25, Metals, Ceramic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2533 ; Physics ; TID-4500, 16th ...
"Contract W-7405-Eng. 36 with the U.S. Atomic Energy Commission.""Report written: July 1, 1964 ; Rep...
Work performed under Contract No. AT(30-1)-2784 at the Nuclear Metals, Inc."September 17, 1963."Titl...
"NRC FIN B5948.""NUREG/CR-0235."Includes bibliographical references.Mode of access: Internet
"Project no. 7360, Task no. 73603.""Prepared under Contract no. AF 33 (616)-6312, by the Southern Re...
"Materials Central, Contract no. AF 33(616)-6552, Project no. 7381."Mode of access: Internet
"June 10, 1953."Includes bibliographical references (p. 7).Mode of access: Internet
http://deepblue.lib.umich.edu/bitstream/2027.42/4953/5/bac2358.0001.001.pdfhttp://deepblue.lib.umich...
Prepared at Lewis Research Center."April 1969"--Cover.Includes bibliographical references (p. 31).Mo...
"Project No.39, U.S. Atomic Energy Commission, Contract No. AT(04-3)-314.""November 21, 1960."Includ...
"APEX-676 ; UC-25, Metals, Ceramics, and Materials; TID-4500 (16th Ed.)""December 1961."Prepared by ...
U.S. Atomic Energy Commission ;Mode of access: Internet.Description based on: GEMP-3A (July 1, 1961-...
"Issued: April 1, 1957.""NAA-SR-1846 ; Metallurgy and Ceramics."Includes bibliographical references ...
"DATE.""Project No. 7353, Task No. 735301.""June 1962."Includes bibliographical references (page 45)...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-3192-MS ; UC-25, Metals, Ceramic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2533 ; Physics ; TID-4500, 16th ...
"Contract W-7405-Eng. 36 with the U.S. Atomic Energy Commission.""Report written: July 1, 1964 ; Rep...