This report summarizes the conceptual design study on the experimental gas cooled reactor under construction in the Oak Ridge area."Contract no. AT(10-1)-925."August 1959.""AECU-4701 (Pt. 2)."This report summarizes the conceptual design study on the experimental gas cooled reactor under construction in the Oak Ridge area.Mode of access: Internet
"United States Atomic Energy Commission Contract W-7405-ENG.36"--Cover."LA-3294-MS ; UC-20, Controll...
"Prepared for U.S. Atomic Energy Commission, Northern States Power Company, and Central Utilities At...
Report documenting ongoing research and developments at the Oak Ridge National Laboratory's Gas-Cool...
"Contract no. AT(10-1)-925."August 1959."At head of title: AECU-4701(Pt. 1).Mode of access: Internet
Report documenting the systems, operating procedures, and design of the Oak Ridge National Laborator...
"May 1, 1957.""This report is submitted in complete fulfillment of AEC Contract AT (30-3)-275."Inclu...
"A Proposal Study carried out for the Chicago Operations Office of the U.S. Atomic Energy Commission...
Report that describes the Oak Ridge National Laboratory Experimental Gas-Cooled Reactor, problems wi...
This meeting is one of a series of Civilian Power Reactor Conferences and was held colncident with a...
Report documenting the design and testing progress of the Oak Ridge National Laboratory's Gas-Cooled...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2332 ; Reactors--Power ; (TID-45...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LAMS-2126 ; Reactors--Power (TID-45...
Report documenting the research and development of the Oak Ridge National Laboratory's Gas-Cooled Re...
"Contract AT(04-3)--314."Items are numbered within the larger series."Research and development progr...
Report documenting the design and testing progress of the Oak Ridge National Laboratory's Gas-Cooled...
"United States Atomic Energy Commission Contract W-7405-ENG.36"--Cover."LA-3294-MS ; UC-20, Controll...
"Prepared for U.S. Atomic Energy Commission, Northern States Power Company, and Central Utilities At...
Report documenting ongoing research and developments at the Oak Ridge National Laboratory's Gas-Cool...
"Contract no. AT(10-1)-925."August 1959."At head of title: AECU-4701(Pt. 1).Mode of access: Internet
Report documenting the systems, operating procedures, and design of the Oak Ridge National Laborator...
"May 1, 1957.""This report is submitted in complete fulfillment of AEC Contract AT (30-3)-275."Inclu...
"A Proposal Study carried out for the Chicago Operations Office of the U.S. Atomic Energy Commission...
Report that describes the Oak Ridge National Laboratory Experimental Gas-Cooled Reactor, problems wi...
This meeting is one of a series of Civilian Power Reactor Conferences and was held colncident with a...
Report documenting the design and testing progress of the Oak Ridge National Laboratory's Gas-Cooled...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2332 ; Reactors--Power ; (TID-45...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LAMS-2126 ; Reactors--Power (TID-45...
Report documenting the research and development of the Oak Ridge National Laboratory's Gas-Cooled Re...
"Contract AT(04-3)--314."Items are numbered within the larger series."Research and development progr...
Report documenting the design and testing progress of the Oak Ridge National Laboratory's Gas-Cooled...
"United States Atomic Energy Commission Contract W-7405-ENG.36"--Cover."LA-3294-MS ; UC-20, Controll...
"Prepared for U.S. Atomic Energy Commission, Northern States Power Company, and Central Utilities At...
Report documenting ongoing research and developments at the Oak Ridge National Laboratory's Gas-Cool...