This paper describes a branch and bound algorithm which can solve assembly line balancing probems with nine modifications to the originally formulated problem of minimizing the required number of assembly stations, given a cycle time, a set of tasks with given deterministic performance times, and between-task precedence relationships. The first two formulation modifications are those of permitting planned imbalance in the total of task performance times at each assembly station, and allowing specific tasks to be assigned to specific types of assembly stations. Seven further problem modifications can be solved by the proposed algorithm, or by any algorithm or heuristic that can solve problems containing these first two modifications. They ar...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
Abstract approved: Line balancing is concerned with the optimal assignment of work elements to indiv...
10.1007/s00170-006-0821-yInternational Journal of Advanced Manufacturing Technology361-2169-177IJAT
International audienceThe design of assembly lines is an important issue in manufacturing engineerin...
In this study we consider a U-shaped assembly line balancing problem where each task uses a specifie...
Abstract: A two-phase technique for solving flexible assembly line balancing problems is proposed. I...
Despite the fact that most of the published papers concerning the assembly line balancing problem co...
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing...
In this paper, we present a real-life Assembly Line Balancing Problem for an electronics manufacturi...
Purpose Balancing assembly line means to assign assembly tasks to several stations, respecting prece...
Abstract In this paper, a methodology is developed to solve the single-model, stochastic assembly li...
AbstractAssembly line is a sequential work flow production systems which are still typical in the ma...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing...
Despite the most of the published papers regarding the assembly line balancing problem consider stra...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
Abstract approved: Line balancing is concerned with the optimal assignment of work elements to indiv...
10.1007/s00170-006-0821-yInternational Journal of Advanced Manufacturing Technology361-2169-177IJAT
International audienceThe design of assembly lines is an important issue in manufacturing engineerin...
In this study we consider a U-shaped assembly line balancing problem where each task uses a specifie...
Abstract: A two-phase technique for solving flexible assembly line balancing problems is proposed. I...
Despite the fact that most of the published papers concerning the assembly line balancing problem co...
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing...
In this paper, we present a real-life Assembly Line Balancing Problem for an electronics manufacturi...
Purpose Balancing assembly line means to assign assembly tasks to several stations, respecting prece...
Abstract In this paper, a methodology is developed to solve the single-model, stochastic assembly li...
AbstractAssembly line is a sequential work flow production systems which are still typical in the ma...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing...
Despite the most of the published papers regarding the assembly line balancing problem consider stra...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
Abstract approved: Line balancing is concerned with the optimal assignment of work elements to indiv...
10.1007/s00170-006-0821-yInternational Journal of Advanced Manufacturing Technology361-2169-177IJAT