Prepared at Battelle Memorial Institute, under contract no. W-7405-eng-92."1956"--P. 46."Date declassified: November 9, 1955"--P. [2] of cover."April 1, 1952.""BMI-732."Mode of access: Internet.This bibliographic record is available under the Creative Commons CC0 public domain dedication. The University of Florida Libraries, as creator of this bibliographic record, has waived all rights to it worldwide under copyright law, including all related and neighboring rights, to the extent allowed by law
Work performed at Sylvania Electric Products, Inc."March 24, 1949.""AECD-2869"Includes bibliographic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LAMS-2382 ; Metallurgy and Ceramics...
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
Work performed at Battelle Memorial Institute under Contract No. W-7405-eng-92."Date Declassified: A...
Prepared at Battelle Memorial Institute, under contract no. W-7405-eng-92."Date declassified: Novemb...
"Date declassified: December 9, 1955"--P. [2] of cover."Subject category: Metallurgy and Ceramics.""...
"U.S. Atomic Energy Commission Contract AT(29-1)-1106.""RFP-478 ; UC-25 Metals, Ceramics, and Materi...
Work performed at the Battelle Memorial Institute, Columbus, Ohio."Date Declassified: November 22, 1...
Prepared at Battelle Memorial Institute, under contract no. W-7405-eng-92."Date declassified: Novemb...
"Report written: July 1957 ; Report distributed: October 11, 1957.""Contract W-7405-ENG.36 with the ...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2229 ; Chemistry--General ; TID-...
The continuous production of beryllium metal by low-temperature fused salt electrolysis into a conti...
Work performed at the Argonne National Laboratory."Date of Manuscript: March 23, 1948 ; Date Declass...
Work performed at the Massachusetts Institute of Technology."Date Declassified: July 20, 1949."Inclu...
"Contract AT-30-1 GEN 366.""Date declassified: December 8, 1955"--Page 2 of cover."Sylvania Electric...
Work performed at Sylvania Electric Products, Inc."March 24, 1949.""AECD-2869"Includes bibliographic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LAMS-2382 ; Metallurgy and Ceramics...
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
Work performed at Battelle Memorial Institute under Contract No. W-7405-eng-92."Date Declassified: A...
Prepared at Battelle Memorial Institute, under contract no. W-7405-eng-92."Date declassified: Novemb...
"Date declassified: December 9, 1955"--P. [2] of cover."Subject category: Metallurgy and Ceramics.""...
"U.S. Atomic Energy Commission Contract AT(29-1)-1106.""RFP-478 ; UC-25 Metals, Ceramics, and Materi...
Work performed at the Battelle Memorial Institute, Columbus, Ohio."Date Declassified: November 22, 1...
Prepared at Battelle Memorial Institute, under contract no. W-7405-eng-92."Date declassified: Novemb...
"Report written: July 1957 ; Report distributed: October 11, 1957.""Contract W-7405-ENG.36 with the ...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2229 ; Chemistry--General ; TID-...
The continuous production of beryllium metal by low-temperature fused salt electrolysis into a conti...
Work performed at the Argonne National Laboratory."Date of Manuscript: March 23, 1948 ; Date Declass...
Work performed at the Massachusetts Institute of Technology."Date Declassified: July 20, 1949."Inclu...
"Contract AT-30-1 GEN 366.""Date declassified: December 8, 1955"--Page 2 of cover."Sylvania Electric...
Work performed at Sylvania Electric Products, Inc."March 24, 1949.""AECD-2869"Includes bibliographic...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LAMS-2382 ; Metallurgy and Ceramics...
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...