"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2269 ; Metallurgy and Ceramics ; (TID-4500, 14th edition)""Report written: July 1958 ; Report distributed: March 12, 1959."Includes bibliographical references (p. 46).Mode of access: Internet
SIGLEAvailable from British Library Document Supply Centre-DSC:DXN049689 / BLDSC - British Library D...
"Metals, Ceramics, and Materials (UC-25) TID 4500, December 15, 1960.""May, 1962.""Ames Laboratory a...
"Date declassified: November 30, 1955"--P. [2] of cover."Contract No. W-7405-eng-92.""May 21, 1952."...
The thermal couductivity of the Pu-- Fe eutectic mixture (9.5 at.% Fe) was measured in both the soli...
"Knolls Atomic Power Laboratory operated for the United States Atomic Energy Commission by General E...
"Metallurgy and Ceramics."Work performed at the Massachusetts Institute of Technology."July 1, 1952....
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2398 ; Physics and Mathematics ;...
"Bettis Atomic Power Laboratory, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by ...
"Bettis Atomic Power Laboratory operated for the U.S. Atomic Energy Commission by Westinghouse Elect...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2392 ; Physics and Mathematics ;...
"Bettis Plant, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by Westinghouse Elect...
"Contract No. AT(30-1)-960.""March 15, 1953."Includes bibliographical references (page 97-98).Mode o...
"Metallurgy and Ceramics.""Work performed under Contract No. At(30-1)-960.""October 1, 1952."Mode of...
"United States Atomic Energy Commission contract W-7405-Eng.36"--Cover."LA-3211 ; UC-38, Engineering...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2316 ; Physics and Mathematics ;...
SIGLEAvailable from British Library Document Supply Centre-DSC:DXN049689 / BLDSC - British Library D...
"Metals, Ceramics, and Materials (UC-25) TID 4500, December 15, 1960.""May, 1962.""Ames Laboratory a...
"Date declassified: November 30, 1955"--P. [2] of cover."Contract No. W-7405-eng-92.""May 21, 1952."...
The thermal couductivity of the Pu-- Fe eutectic mixture (9.5 at.% Fe) was measured in both the soli...
"Knolls Atomic Power Laboratory operated for the United States Atomic Energy Commission by General E...
"Metallurgy and Ceramics."Work performed at the Massachusetts Institute of Technology."July 1, 1952....
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2398 ; Physics and Mathematics ;...
"Bettis Atomic Power Laboratory, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by ...
"Bettis Atomic Power Laboratory operated for the U.S. Atomic Energy Commission by Westinghouse Elect...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2392 ; Physics and Mathematics ;...
"Bettis Plant, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by Westinghouse Elect...
"Contract No. AT(30-1)-960.""March 15, 1953."Includes bibliographical references (page 97-98).Mode o...
"Metallurgy and Ceramics.""Work performed under Contract No. At(30-1)-960.""October 1, 1952."Mode of...
"United States Atomic Energy Commission contract W-7405-Eng.36"--Cover."LA-3211 ; UC-38, Engineering...
"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission.""LA-2316 ; Physics and Mathematics ;...
SIGLEAvailable from British Library Document Supply Centre-DSC:DXN049689 / BLDSC - British Library D...
"Metals, Ceramics, and Materials (UC-25) TID 4500, December 15, 1960.""May, 1962.""Ames Laboratory a...
"Date declassified: November 30, 1955"--P. [2] of cover."Contract No. W-7405-eng-92.""May 21, 1952."...