"Engineering and Equipment (TID-4500, 17th Ed.).""Printed for the United States Atomic Energy Commission Contract AT(07-2)-1.""November 1961.""DP-666."Includes bibliographical references (p. 11).Mode of access: Internet
"Engineering and Equipment (TID-4500, 16th Ed.).""Printed for theUnited States Atomic Energy Commiss...
"Equipment, Methods, and Techniques (TID-4500, 15th Ed.).""Printed for the United States Atomic Ener...
"NAA-SR-4387 ; Reactors--General.""Contract AT(11-1)-GEN-8 ; Issued: Nov. 1, 1960."Mode of access: I...
"Equipment, Methods, and Techniques (TID-4500, 15th Ed.).""Printed for the United States Atomic Ener...
The average leakage rate was less than 0.3 pound per year per linear inch of gasket when mockups of ...
Prepared at Langley Research Center."March 1968"--Cover.Includes bibliographical references (p. 13)....
The leakage of water from the stuffing boxes of four commercially available valves was measured unde...
"United States Atomic Energy Commission, Savannah River Operations Office, Contract AT (38-1) 213, s...
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
"United States Atomic Energy Commission Office of Technical Information"--Cover."TID-7604 reactor-te...
"Engineering.""Printed for the United States Atomic Energy Commission Contract AT(07-2)-1.""August 1...
"May 1964.""TID-20583."Includes bibliographical references.Mode of access: Internet
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
"UC-38: Engineering and Equipment; TID-4500 (16th Edition).""Contract AT-11-1-GEN-14.""September 196...
"To be delivered before the meeting of the American Water Works Association, San Francisco October 2...
"Engineering and Equipment (TID-4500, 16th Ed.).""Printed for theUnited States Atomic Energy Commiss...
"Equipment, Methods, and Techniques (TID-4500, 15th Ed.).""Printed for the United States Atomic Ener...
"NAA-SR-4387 ; Reactors--General.""Contract AT(11-1)-GEN-8 ; Issued: Nov. 1, 1960."Mode of access: I...
"Equipment, Methods, and Techniques (TID-4500, 15th Ed.).""Printed for the United States Atomic Ener...
The average leakage rate was less than 0.3 pound per year per linear inch of gasket when mockups of ...
Prepared at Langley Research Center."March 1968"--Cover.Includes bibliographical references (p. 13)....
The leakage of water from the stuffing boxes of four commercially available valves was measured unde...
"United States Atomic Energy Commission, Savannah River Operations Office, Contract AT (38-1) 213, s...
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
"United States Atomic Energy Commission Office of Technical Information"--Cover."TID-7604 reactor-te...
"Engineering.""Printed for the United States Atomic Energy Commission Contract AT(07-2)-1.""August 1...
"May 1964.""TID-20583."Includes bibliographical references.Mode of access: Internet
Work performed for the U.S. Atomic Energy Commission by Union Carbide Nuclear Company--a division of...
"UC-38: Engineering and Equipment; TID-4500 (16th Edition).""Contract AT-11-1-GEN-14.""September 196...
"To be delivered before the meeting of the American Water Works Association, San Francisco October 2...
"Engineering and Equipment (TID-4500, 16th Ed.).""Printed for theUnited States Atomic Energy Commiss...
"Equipment, Methods, and Techniques (TID-4500, 15th Ed.).""Printed for the United States Atomic Ener...
"NAA-SR-4387 ; Reactors--General.""Contract AT(11-1)-GEN-8 ; Issued: Nov. 1, 1960."Mode of access: I...