"Reactors - Power (TID-4500, 15th Ed.).""Printed for the United States Atomic Energy Commission Contract AT(07-2)-1.""October 1959.""DP-413."Introduction -- The Heavy Water Components Test Reactor (HWCTR) / by L.M. Arnett -- Neutron economy in a critical mockup of the HWCTR / by N.P. Baumann, W.E. Graves, and G.F. O'Neill -- Flux distributions in a critical mockup of the HWCTR / by W.E. Graves and T.J. Hurley -- Calculations of physics parameters of the HWCTR / by J.W. Wade -- Power excursions in the HWCTR / by D. Randall and D.S. St. John.Mode of access: Internet
Safeguards analyses of the boiling D/sub 2/O loop of the Heavy Water Components Test Reactor (HWCTR)...
"Reactor, Technology (TID-4500, 17th Ed.).""Printed for the United States Atomic Energy Commission C...
The Heavy Water Component Test Reactor (HWCTR) facility is a pressurized heavy water reactor that wa...
"Reactors - Power (TID-4500, 14th Ed.).""Printed for the United States Atomic Energy Commission Cont...
"Reactors - Power (TID-4500, 14th Ed.).""Printed for the United States Atomic Energy Commission Cont...
At the end of November, 20% of the construction and 80% of the firm design of the Heavy Water Compon...
At the end of 1959, 25% of the construction and 85% of the firm design of the Heavy Water Components...
Continued progress is reported on the design and construction of the Heavy Water Components Test Rea...
At the end of February 1960, 30% of the construction of the Heavy Water Components Test Reactor (HWC...
AEC Contract AT(30-1)2602 ; B & W Contract 596-3055.""BAW-1209 ; AEC R & D Report ; UC-80 (TID-4500,...
"Reactors - Power (TID-4500, 15th Ed.).""Printed by Savannah River Laboratory for the United States ...
"Reactor Technology (TID-4500, 34th Ed.).""Contract AT(07-2)-1 with the United States Atomic Energy ...
Work performed at the E.I. du Pont de Nemours & Company, Explosives Department, Atomic Energy Diviso...
"Reactor Technology (TID-4500, 16th Ed.).""Printed by Savannah River Laboratory for the United State...
Approximately one-quarter of the construction and 85% of the firm design of the Heavy jWater Compone...
Safeguards analyses of the boiling D/sub 2/O loop of the Heavy Water Components Test Reactor (HWCTR)...
"Reactor, Technology (TID-4500, 17th Ed.).""Printed for the United States Atomic Energy Commission C...
The Heavy Water Component Test Reactor (HWCTR) facility is a pressurized heavy water reactor that wa...
"Reactors - Power (TID-4500, 14th Ed.).""Printed for the United States Atomic Energy Commission Cont...
"Reactors - Power (TID-4500, 14th Ed.).""Printed for the United States Atomic Energy Commission Cont...
At the end of November, 20% of the construction and 80% of the firm design of the Heavy Water Compon...
At the end of 1959, 25% of the construction and 85% of the firm design of the Heavy Water Components...
Continued progress is reported on the design and construction of the Heavy Water Components Test Rea...
At the end of February 1960, 30% of the construction of the Heavy Water Components Test Reactor (HWC...
AEC Contract AT(30-1)2602 ; B & W Contract 596-3055.""BAW-1209 ; AEC R & D Report ; UC-80 (TID-4500,...
"Reactors - Power (TID-4500, 15th Ed.).""Printed by Savannah River Laboratory for the United States ...
"Reactor Technology (TID-4500, 34th Ed.).""Contract AT(07-2)-1 with the United States Atomic Energy ...
Work performed at the E.I. du Pont de Nemours & Company, Explosives Department, Atomic Energy Diviso...
"Reactor Technology (TID-4500, 16th Ed.).""Printed by Savannah River Laboratory for the United State...
Approximately one-quarter of the construction and 85% of the firm design of the Heavy jWater Compone...
Safeguards analyses of the boiling D/sub 2/O loop of the Heavy Water Components Test Reactor (HWCTR)...
"Reactor, Technology (TID-4500, 17th Ed.).""Printed for the United States Atomic Energy Commission C...
The Heavy Water Component Test Reactor (HWCTR) facility is a pressurized heavy water reactor that wa...