"Reactors - Power""Operated by the University of Chicago under Contract W-31-109-eng-38.""March 1958."Includes bibliographical references and abstract.Operated by The University of ChicagoMode of access: Internet
At head of title: SPERT."National Reactor Testing Station"--Cover."Reactor Technology ; TID-4500 (17...
"Reactors-General ; (TID-4500, Ed. 13)"--Cover."June 1, 1957"--Cover.Includes bibliographical refere...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
A rough mock-up of the EBR-I reactor was built in the ZPR-III critical assembly machine, with resist...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"National Reactor Testing Station"--Cover."Reactor Technology ; TID-4500 (17th Ed.).""Issued: July 2...
"Date Declassified: December 2, 1955."--P. [2] of cover."Work performed under Contract No. AT-30-2-G...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"June 22, 1954."Includes bibliographical references.U.S. Atomic Energy Commission Contract ;Mode of ...
A measurement of the isothermal temperature coefficient of reactivity was made in December 1960 for ...
"August 15, 1962"Includes bibliographical references (pages 51-59).U.S. Atomic Energy Commission Con...
"October 1960"Bibliography: p. 52.Operated by the University of Chicago underMode of access: Interne...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
Prepared by General Electric Company, Atomic Power Equipment Department, for the U.S. Atomic Energy ...
"NAA-SR-1641 ; Physics.""Contract AT-(04-3)-49 ; Issue date: September 1, 1956."Includes bibliograph...
At head of title: SPERT."National Reactor Testing Station"--Cover."Reactor Technology ; TID-4500 (17...
"Reactors-General ; (TID-4500, Ed. 13)"--Cover."June 1, 1957"--Cover.Includes bibliographical refere...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
A rough mock-up of the EBR-I reactor was built in the ZPR-III critical assembly machine, with resist...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"National Reactor Testing Station"--Cover."Reactor Technology ; TID-4500 (17th Ed.).""Issued: July 2...
"Date Declassified: December 2, 1955."--P. [2] of cover."Work performed under Contract No. AT-30-2-G...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"June 22, 1954."Includes bibliographical references.U.S. Atomic Energy Commission Contract ;Mode of ...
A measurement of the isothermal temperature coefficient of reactivity was made in December 1960 for ...
"August 15, 1962"Includes bibliographical references (pages 51-59).U.S. Atomic Energy Commission Con...
"October 1960"Bibliography: p. 52.Operated by the University of Chicago underMode of access: Interne...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
Prepared by General Electric Company, Atomic Power Equipment Department, for the U.S. Atomic Energy ...
"NAA-SR-1641 ; Physics.""Contract AT-(04-3)-49 ; Issue date: September 1, 1956."Includes bibliograph...
At head of title: SPERT."National Reactor Testing Station"--Cover."Reactor Technology ; TID-4500 (17...
"Reactors-General ; (TID-4500, Ed. 13)"--Cover."June 1, 1957"--Cover.Includes bibliographical refere...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...