At head of title: Argonne National Laboratory."Work completed: November 1956.""Metallurgy Division program 7.6.7.""March, 1958."Includes bibliographical references (p. 27) and abstract.Operated by the University of Chicago underMode of access: Internet
"ORNL-2821 ; UC-10--Chemistry-Separation Processes for Plutonium and Uranum" -c.p.Includes bibliogra...
"March 1962"Bibliography: p. 39.Operated by the University of Chicago underMode of access: Internet
Report describing the design and usage of the BORAX V nuclear reactor, its surrounding facility, sys...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"May 1961""Final Report - Metallurgy Program 7.6.11"Bibliography: p. 36.Operated by the University o...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"AEC Research and Development Report""(TID-4500, 15th Ed.)"Reactors - Power""October, 1959."Includes...
At head of title: Argonne National Laboratory."Final report - Metallurgy Program 9.2.1.""August 1954...
At head of title: Argonne National Laboratory."Metallurgy Division Program 1.1.10."Cover title.Origi...
"Metallurgy Division Program 7.8.6""January 1963"Operated by the University of Chicago underMode of ...
At head of title: Argonne National Laboratory.Cover title.Originally published 1954."March 15, 1954....
"June 1965."Includes bibliographical references (p. 41).Pacific Northwest Laboratories operated by B...
Work performed at the Argonne National Laboratory, Lemont, Illinois."Some nontechnical and nonessent...
The procedures used in fabricating the core loading for the natural water-cooled Borax-IV reactor ar...
Developments made in metallurgy at Argonne National Laboratory are reported. Information is presente...
"ORNL-2821 ; UC-10--Chemistry-Separation Processes for Plutonium and Uranum" -c.p.Includes bibliogra...
"March 1962"Bibliography: p. 39.Operated by the University of Chicago underMode of access: Internet
Report describing the design and usage of the BORAX V nuclear reactor, its surrounding facility, sys...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"May 1961""Final Report - Metallurgy Program 7.6.11"Bibliography: p. 36.Operated by the University o...
"Operated by the University of Chicago under Contract W-31-109-eng-38."At head of title: Argonne Nat...
"AEC Research and Development Report""(TID-4500, 15th Ed.)"Reactors - Power""October, 1959."Includes...
At head of title: Argonne National Laboratory."Final report - Metallurgy Program 9.2.1.""August 1954...
At head of title: Argonne National Laboratory."Metallurgy Division Program 1.1.10."Cover title.Origi...
"Metallurgy Division Program 7.8.6""January 1963"Operated by the University of Chicago underMode of ...
At head of title: Argonne National Laboratory.Cover title.Originally published 1954."March 15, 1954....
"June 1965."Includes bibliographical references (p. 41).Pacific Northwest Laboratories operated by B...
Work performed at the Argonne National Laboratory, Lemont, Illinois."Some nontechnical and nonessent...
The procedures used in fabricating the core loading for the natural water-cooled Borax-IV reactor ar...
Developments made in metallurgy at Argonne National Laboratory are reported. Information is presente...
"ORNL-2821 ; UC-10--Chemistry-Separation Processes for Plutonium and Uranum" -c.p.Includes bibliogra...
"March 1962"Bibliography: p. 39.Operated by the University of Chicago underMode of access: Internet
Report describing the design and usage of the BORAX V nuclear reactor, its surrounding facility, sys...