"Operated by the University of Chicago under contract W-31-109-eng-38.""ANL-6259.""May 1961."Includes bibliography references : p. 36.Mode of access: Internet
"Bettis Atomic Power Laboratory, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by ...
"Knolls Atomic Power Laboratory operated for the United States Atomic Energy Commission by General E...
Thesis (M.A.)--University of Illinois at Urbana-Champaign, 1921.Includes bibliographical references....
"May 1960""Program 10.2.1"Bibliography: p. 23.Operated by the University of Chicago underMode of acc...
At head of title: Argonne National Laboratory."December 1953."Includes bibliographical references (p...
Includes bibliographical references (p. 9, 21, 29)pt. 1. The formation field from both high-potentia...
Work performed at the University of Oregeon."September 1953."Includes bibliographical references (p....
SIGLEAvailable from British Library Document Supply Centre- DSC:D88182 / BLDSC - British Library Doc...
"Atomic Energy Commission Contract Number AT(11-1)-82, Project Number 1.""Technical report number XV...
"Metals, Ceramics, and Materials (TID-4500, 34th Ed.).""Contract AT(07-2)-1 with the United States A...
"May 16, 1952.""TID-5116."Includes bibliographical references (page 213).Mode of access: Internet.Th...
Work performed at the University of Oregon."Work performed under Contract No. AT(45-1)-535"--Added t...
Work performed at the University of Oregon."Work performed under Contract No. AT(45-1)-535"--P. [ii]...
It has been determined that two basic factors influence on the electrical resistance value of the fi...
UnrestrictedIn the present study, electrochemical evaluation of advanced surface modification method...
"Bettis Atomic Power Laboratory, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by ...
"Knolls Atomic Power Laboratory operated for the United States Atomic Energy Commission by General E...
Thesis (M.A.)--University of Illinois at Urbana-Champaign, 1921.Includes bibliographical references....
"May 1960""Program 10.2.1"Bibliography: p. 23.Operated by the University of Chicago underMode of acc...
At head of title: Argonne National Laboratory."December 1953."Includes bibliographical references (p...
Includes bibliographical references (p. 9, 21, 29)pt. 1. The formation field from both high-potentia...
Work performed at the University of Oregeon."September 1953."Includes bibliographical references (p....
SIGLEAvailable from British Library Document Supply Centre- DSC:D88182 / BLDSC - British Library Doc...
"Atomic Energy Commission Contract Number AT(11-1)-82, Project Number 1.""Technical report number XV...
"Metals, Ceramics, and Materials (TID-4500, 34th Ed.).""Contract AT(07-2)-1 with the United States A...
"May 16, 1952.""TID-5116."Includes bibliographical references (page 213).Mode of access: Internet.Th...
Work performed at the University of Oregon."Work performed under Contract No. AT(45-1)-535"--Added t...
Work performed at the University of Oregon."Work performed under Contract No. AT(45-1)-535"--P. [ii]...
It has been determined that two basic factors influence on the electrical resistance value of the fi...
UnrestrictedIn the present study, electrochemical evaluation of advanced surface modification method...
"Bettis Atomic Power Laboratory, Pittsburgh, Pa., operated for the U.S. Atomic Energy Commission by ...
"Knolls Atomic Power Laboratory operated for the United States Atomic Energy Commission by General E...
Thesis (M.A.)--University of Illinois at Urbana-Champaign, 1921.Includes bibliographical references....