2013-2014 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptRGCResearch Grant Council of the Hong Kong Special Administrative Region, China (PolyU5337/09E)Publishe
SIGLEAvailable from British Library Document Supply Centre- DSC:DX185661 / BLDSC - British Library D...
Extreme rainstorm is a main factor to cause urban floods when urban drainage system cannot discharge...
This study examines the fresh and flushing water pump installations for high-rise residential buildi...
Building drainage demands are assumed random and intermittent. The existing Hunter-based models have...
Purpose - To determine the probable drainage load for sizing a stack serving a number of domestic wa...
Domestic flushing water demands are transient and influenced by occupant load variations as well as ...
The probable maximum flow rates and flushing water consumption of a residential development are two ...
This paper reports the probable maximum demands of the drainage systems in 5 residential building es...
Purpose - The purpose of this paper is to examine the air pressure variations in an in-use drainage ...
201812 bcrcVersion of RecordRGCOthersRGC: Research Grants Council of the Hong Kong Special Administr...
As a result of expected increase of rainfall intensities due to climate change, there is an increasi...
SIGLEAvailable from British Library Document Supply Centre-DSC:DXN034761 / BLDSC - British Library D...
Fixture unit approach used for estimating the probable maximum simultaneous demands in building wate...
key words: discharge generation, drainage water recovery, lag time, response time, tile drainage dis...
The design and proper operation on the above-ground drainage systems can be challenging in a densely...
SIGLEAvailable from British Library Document Supply Centre- DSC:DX185661 / BLDSC - British Library D...
Extreme rainstorm is a main factor to cause urban floods when urban drainage system cannot discharge...
This study examines the fresh and flushing water pump installations for high-rise residential buildi...
Building drainage demands are assumed random and intermittent. The existing Hunter-based models have...
Purpose - To determine the probable drainage load for sizing a stack serving a number of domestic wa...
Domestic flushing water demands are transient and influenced by occupant load variations as well as ...
The probable maximum flow rates and flushing water consumption of a residential development are two ...
This paper reports the probable maximum demands of the drainage systems in 5 residential building es...
Purpose - The purpose of this paper is to examine the air pressure variations in an in-use drainage ...
201812 bcrcVersion of RecordRGCOthersRGC: Research Grants Council of the Hong Kong Special Administr...
As a result of expected increase of rainfall intensities due to climate change, there is an increasi...
SIGLEAvailable from British Library Document Supply Centre-DSC:DXN034761 / BLDSC - British Library D...
Fixture unit approach used for estimating the probable maximum simultaneous demands in building wate...
key words: discharge generation, drainage water recovery, lag time, response time, tile drainage dis...
The design and proper operation on the above-ground drainage systems can be challenging in a densely...
SIGLEAvailable from British Library Document Supply Centre- DSC:DX185661 / BLDSC - British Library D...
Extreme rainstorm is a main factor to cause urban floods when urban drainage system cannot discharge...
This study examines the fresh and flushing water pump installations for high-rise residential buildi...