The Danish Wave Energy Centre (DanWEC) has been established in 2009 because of participated desire to market the trial wave energy projects which are already in Hanstholm and others to come. The DanWEC is a part of Hanstholm harbour in the North-West of Denmark. The Center will contribute at creating a local base for knowledge, education and possibly a workplace which will be leased out to trial projects. It is therefore likely that different developers will deploy their wave energy devices during the next years in this location and therefore detailed knowledge on a number of environmental and physical parameter is necessary. The present report has been prepared by Lucia Margheritini (lm@civil.aau.dk), Post.Doc at the Department of Civil En...
This technical report presents experiments carried out in the current flume and wave basin at Aalbor...
This report is a product of the co-operation agreement between Aalborg University and LEANCON (by Ku...
The first Wave Dragon prototype power production testing started May 2003 and ended temporarily prim...
The Danish Wave Energy Centre (DanWEC) has been established in 2009 because of participated desire t...
DANWEC will enable wave energy developers located at Hanstholm to share resources, in order to encre...
Marine Environmental Data are collected as a part of the routine monitoring programme of the marine ...
This paper aims at giving an overview of the developments researchers at the Department of Civil Eng...
The Danish Wave Energy Center (DanWEC) is placed at Hanstholm in the North Sea. DanWEC was formally ...
This project covers two fields of study:a) Wave energy predictability and electricity markets.b) Var...
The wave energy sector is in need of showing positive experience from the real sea trial in order to...
This report is a product of the contract between Aalborg University and TIDENG (by Bent Hilleke) on ...
M. Sc. graduate report in Civil EngineeringM. Sc. Graduate Report in Civil Engineerin
This report presents the results of a study of the wave conditions at the planned location of the pr...
This report present the near-shore waves conditions at Liseleje. This study has been carried out as ...
The work presented in this report was completed under the support from the Danish Energy Technologic...
This technical report presents experiments carried out in the current flume and wave basin at Aalbor...
This report is a product of the co-operation agreement between Aalborg University and LEANCON (by Ku...
The first Wave Dragon prototype power production testing started May 2003 and ended temporarily prim...
The Danish Wave Energy Centre (DanWEC) has been established in 2009 because of participated desire t...
DANWEC will enable wave energy developers located at Hanstholm to share resources, in order to encre...
Marine Environmental Data are collected as a part of the routine monitoring programme of the marine ...
This paper aims at giving an overview of the developments researchers at the Department of Civil Eng...
The Danish Wave Energy Center (DanWEC) is placed at Hanstholm in the North Sea. DanWEC was formally ...
This project covers two fields of study:a) Wave energy predictability and electricity markets.b) Var...
The wave energy sector is in need of showing positive experience from the real sea trial in order to...
This report is a product of the contract between Aalborg University and TIDENG (by Bent Hilleke) on ...
M. Sc. graduate report in Civil EngineeringM. Sc. Graduate Report in Civil Engineerin
This report presents the results of a study of the wave conditions at the planned location of the pr...
This report present the near-shore waves conditions at Liseleje. This study has been carried out as ...
The work presented in this report was completed under the support from the Danish Energy Technologic...
This technical report presents experiments carried out in the current flume and wave basin at Aalbor...
This report is a product of the co-operation agreement between Aalborg University and LEANCON (by Ku...
The first Wave Dragon prototype power production testing started May 2003 and ended temporarily prim...