This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical considerations, simulations and measurements. The work presented here is based on a real-life operating 400 kV power system and initiated by Danish TSO Energinet.dk after having measured the voltage of the cable/overhead line after disconnection. A particular decaying dynamic phase voltage containing voltages higher than the voltage before disconnection appeared. A simulation model for the entire system consisting of overhead lines, crossbonded cable sections and shunt reactor has been created in PSCAD/EMTDC and verified against measurements with go...
Bam 400/132 kV substation in Kerman region, Iran, has a 50 MVAR shunt reactor on 400 kV busbar which...
With the increasing use of high-voltage AC cables at transmission levels, phenomena such as current ...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
Some electrical distribution companies are nowadays replacing overhead lines with underground cables...
This paper presents some of the results obtained from the electrical measurements on a 99.7 km, 150 ...
High-Voltage cables are starting to be more often used to transmit electric energy at high-voltage l...
Extra-high voltage (EHV) lines of 500–750 kV, providing transmission of electricity over long distan...
Construction of 110 kV cable systems, where the line length exceeds ten kilometers requires compensa...
Stringent environmental constraints make the construction of new transmission overhead lines more an...
Abstract – This paper deals with the computation of switching overvoltages in a 400-kV XLPE cable sy...
This paper discusses the problem associated with accidents in the aerial line (AL) ultra-high voltag...
In several cases transmission line circuits with different nominal voltage levels run in parallel on...
Bam 400/132 kV substation in Kerman region, Iran, has a 50 MVAR shunt reactor on 400 kV busbar which...
With the increasing use of high-voltage AC cables at transmission levels, phenomena such as current ...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
Some electrical distribution companies are nowadays replacing overhead lines with underground cables...
This paper presents some of the results obtained from the electrical measurements on a 99.7 km, 150 ...
High-Voltage cables are starting to be more often used to transmit electric energy at high-voltage l...
Extra-high voltage (EHV) lines of 500–750 kV, providing transmission of electricity over long distan...
Construction of 110 kV cable systems, where the line length exceeds ten kilometers requires compensa...
Stringent environmental constraints make the construction of new transmission overhead lines more an...
Abstract – This paper deals with the computation of switching overvoltages in a 400-kV XLPE cable sy...
This paper discusses the problem associated with accidents in the aerial line (AL) ultra-high voltag...
In several cases transmission line circuits with different nominal voltage levels run in parallel on...
Bam 400/132 kV substation in Kerman region, Iran, has a 50 MVAR shunt reactor on 400 kV busbar which...
With the increasing use of high-voltage AC cables at transmission levels, phenomena such as current ...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...