This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical considerations, simulations and measurements. The work presented here is based on a real-life operating 400 kV power system and initiated by Danish TSO Energinet.dk after having measured the voltage of the cable/overhead line after disconnection. A particular decaying dynamic phase voltage containing voltages higher than the voltage before disconnection appeared. A simulation model for the entire system consisting of overhead lines, crossbonded cable sections and shunt reactor has been created in PSCAD/EMTDC and verified against measurements with go...
In several cases transmission line circuits with different nominal voltage levels run in parallel on...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...
Stringent environmental constraints make the construction of new transmission overhead lines more an...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
Some electrical distribution companies are nowadays replacing overhead lines with underground cables...
This paper presents some of the results obtained from the electrical measurements on a 99.7 km, 150 ...
High-Voltage cables are starting to be more often used to transmit electric energy at high-voltage l...
This paper discusses the problem associated with accidents in the aerial line (AL) ultra-high voltag...
On November 2008 the Danish government decided that all Danish transmission lines with a rated volta...
With the increasing use of high-voltage AC cables at transmission levels, phenomena such as current ...
Construction of 110 kV cable systems, where the line length exceeds ten kilometers requires compensa...
Extra-high voltage (EHV) lines of 500–750 kV, providing transmission of electricity over long distan...
Abstract – This paper deals with the computation of switching overvoltages in a 400-kV XLPE cable sy...
In several cases transmission line circuits with different nominal voltage levels run in parallel on...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...
Stringent environmental constraints make the construction of new transmission overhead lines more an...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
This paper demonstrates the results from a detailed study of the dynamic behavior of a shunt reactor...
Some electrical distribution companies are nowadays replacing overhead lines with underground cables...
This paper presents some of the results obtained from the electrical measurements on a 99.7 km, 150 ...
High-Voltage cables are starting to be more often used to transmit electric energy at high-voltage l...
This paper discusses the problem associated with accidents in the aerial line (AL) ultra-high voltag...
On November 2008 the Danish government decided that all Danish transmission lines with a rated volta...
With the increasing use of high-voltage AC cables at transmission levels, phenomena such as current ...
Construction of 110 kV cable systems, where the line length exceeds ten kilometers requires compensa...
Extra-high voltage (EHV) lines of 500–750 kV, providing transmission of electricity over long distan...
Abstract – This paper deals with the computation of switching overvoltages in a 400-kV XLPE cable sy...
In several cases transmission line circuits with different nominal voltage levels run in parallel on...
Faults on EHV lines are generally single-phase-to-ground ones and not permanent in the majority of c...
Stringent environmental constraints make the construction of new transmission overhead lines more an...