The construction method of continuous beam bridges is mostly cantilever casting in place, which has a long construction period and complex process, and is influenced by various factors. Therefore, it can have many adverse effects on the internal forces and deformation of the main beam. To ensure that the line shape of the main beam meets the design and regulatory requirements and that the internal forces of the completed bridge are close to the theoretical design values, ensuring the safe construction of the bridge, it is necessary to monitor the entire construction process of the bridge. This paper takes a certain major bridge as the background, monitors the entire construction process of the main bridge, collects the deflection values at ...
Condition assessment of existing bridge structures is a valuable tool for bridge owners to make reas...
During testing of the structural reliability of a prestressed reinforced concrete bridge built in th...
with footnotes & endnotes: 5,810 Santini-Bell et al- TRB 2010 2 of 16 Instrumentation, structura...
Based on a large span continuous rigid frame bridge in Chongqing of China, the main pier vertical di...
The article describes a system of continuous monitoring of bridge constructions — a system of observ...
AbstractFree cantilever method has become a very common method for the concrete bridges construction...
Prestressed concrete continuous beam-arch composite bridge with concrete-filled steel tube is a new ...
When the bridge components needing maintenance are the world problem at present, and the health moni...
Due to the rapid development of the transportation industry and economy, an increasing number of bri...
In this paper, a bottom-bearing arch bridge is taken as an example to carry out the bridge construct...
Prestressed concrete bridge, made as rigid-frame-continuous combination beams, has a specific struct...
The previously performed market analysis of bridge material in the range of short to medium span len...
Due to the high cost of the bridge health monitoring system, only some large bridges are running the...
During the construction of extradosed cable-stayed bridge in Yunnan province, China, the constructio...
Continuous bridge decks constructed with precast girders undergo significant stress changes caused b...
Condition assessment of existing bridge structures is a valuable tool for bridge owners to make reas...
During testing of the structural reliability of a prestressed reinforced concrete bridge built in th...
with footnotes & endnotes: 5,810 Santini-Bell et al- TRB 2010 2 of 16 Instrumentation, structura...
Based on a large span continuous rigid frame bridge in Chongqing of China, the main pier vertical di...
The article describes a system of continuous monitoring of bridge constructions — a system of observ...
AbstractFree cantilever method has become a very common method for the concrete bridges construction...
Prestressed concrete continuous beam-arch composite bridge with concrete-filled steel tube is a new ...
When the bridge components needing maintenance are the world problem at present, and the health moni...
Due to the rapid development of the transportation industry and economy, an increasing number of bri...
In this paper, a bottom-bearing arch bridge is taken as an example to carry out the bridge construct...
Prestressed concrete bridge, made as rigid-frame-continuous combination beams, has a specific struct...
The previously performed market analysis of bridge material in the range of short to medium span len...
Due to the high cost of the bridge health monitoring system, only some large bridges are running the...
During the construction of extradosed cable-stayed bridge in Yunnan province, China, the constructio...
Continuous bridge decks constructed with precast girders undergo significant stress changes caused b...
Condition assessment of existing bridge structures is a valuable tool for bridge owners to make reas...
During testing of the structural reliability of a prestressed reinforced concrete bridge built in th...
with footnotes & endnotes: 5,810 Santini-Bell et al- TRB 2010 2 of 16 Instrumentation, structura...