Digitization of construction using technologies such as AI, Big Data, Machine Learning, and Internet of Things (IoT) can help improve the productivity and efficiency of the construction industry. Machine learning methods such as Artificial Neural Network (ANN) are used to solve complex problems, including in construction projects. In addition, Earned Value Management (EVM) is used as a method to analyze and control project performance and estimate project completion time. Although EVM has the disadvantage of predicting estimated project completion times that are linear in nature, the use of non-linear methods such as Artificial Neural Network can help improve the accuracy of estimating project completion times that are complex and have a hi...
The construction duration of residential projects, especially in building processes, significantly i...
The duration of a construction project is a key factor to consider before the project starts, as it ...
The implementation of physical work requires good project control because various conditions can aff...
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements ...
Implementation of the project must have a clear direction and goals so that the planned results can ...
This paper presents an application of Artificial Neural Network (ANN) to forecast actual cost of a p...
In most of the construction projects it has been notice that certain causes may lead to delay in con...
Earned Value method (EV) has several weaknesses which makes it difficult to optimally apply in the c...
Abstract - Industrial and construction projects are one of the sectors that support economic growth ...
The management of technical projects is becoming a cha lenge to professional engineers ...
Project managers normally seek strategies to help them certify that projects are accurately implemen...
Infrastructure projects, such as greenhouse construction, are necessary for economic growth. Effecti...
Project scheduling helps show the relationship of each activity to other activities and to the entir...
The management of construction projects are becoming more challenging for civil engineers in the 21s...
Construction projects have their own complexity, from physical and cost planning, time control and b...
The construction duration of residential projects, especially in building processes, significantly i...
The duration of a construction project is a key factor to consider before the project starts, as it ...
The implementation of physical work requires good project control because various conditions can aff...
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements ...
Implementation of the project must have a clear direction and goals so that the planned results can ...
This paper presents an application of Artificial Neural Network (ANN) to forecast actual cost of a p...
In most of the construction projects it has been notice that certain causes may lead to delay in con...
Earned Value method (EV) has several weaknesses which makes it difficult to optimally apply in the c...
Abstract - Industrial and construction projects are one of the sectors that support economic growth ...
The management of technical projects is becoming a cha lenge to professional engineers ...
Project managers normally seek strategies to help them certify that projects are accurately implemen...
Infrastructure projects, such as greenhouse construction, are necessary for economic growth. Effecti...
Project scheduling helps show the relationship of each activity to other activities and to the entir...
The management of construction projects are becoming more challenging for civil engineers in the 21s...
Construction projects have their own complexity, from physical and cost planning, time control and b...
The construction duration of residential projects, especially in building processes, significantly i...
The duration of a construction project is a key factor to consider before the project starts, as it ...
The implementation of physical work requires good project control because various conditions can aff...