Project has been running since March 2011. • Three dwellings monitored include the first Scottish Passive house, a Low Energy House (no MVHR), and a 1950s dwelling; located in Dunoon, Scotland. • Monitoring includes: energy use; internal and external conditions (Temperatures, RH and CO2 levels inside and temperature and solar radiation outside); and systems performance (including solar hot water). • Post occupancy evaluation (POE) carried out through inspection and questionnaire. • Energy used, CO2 and relative humidity levels compared. • Operation of the different ventilation schemes highlighted. • Costs and electricity tariffs highlighted. • Learnings identified include ventilation, heat pump, solar and auxiliary hot water services. • Imp...
In real operation, buildings rarely perform as predicted during the design phase. The mismatch betwe...
This Technical Paper sets out the pre-‐ and post-‐ intervention monitoring work carried out by The...
Summary The work aims to estimate the likely duration of monitoring which will be required to allow ...
Project has been running since March 2011. • Three dwellings monitored include the first Scottish Pa...
This paper describes an investigation carried out to understand the performance in practice of the f...
The drive to reduce carbon emissions and energy utilisation directly associated with dwellings sugge...
This paper describes an investigation carried out to understand the performance in practice of the f...
Climate change and sustainability legislation in recent years has led to significant changes in cons...
Energy usage of households accounts for a significant portion of total energy consumption and carbon...
In the UK housing sector, changes to building regulations have raised standards for fabric performan...
This paper will describe the results of a 2-year monitoring programme of 4 Passivhaus dwellings in S...
The performance, monitored over 2 years, of side by side detached Welsh Passive is presented. The ho...
The monitored performance of the first new London dwelling certified to the Passive House standard i...
In the UK housing sector, changes to building regulations have raised standards for fabric performan...
It is estimated that 80% of the 2050 building stock already exists and given targets of an 80% reduc...
In real operation, buildings rarely perform as predicted during the design phase. The mismatch betwe...
This Technical Paper sets out the pre-‐ and post-‐ intervention monitoring work carried out by The...
Summary The work aims to estimate the likely duration of monitoring which will be required to allow ...
Project has been running since March 2011. • Three dwellings monitored include the first Scottish Pa...
This paper describes an investigation carried out to understand the performance in practice of the f...
The drive to reduce carbon emissions and energy utilisation directly associated with dwellings sugge...
This paper describes an investigation carried out to understand the performance in practice of the f...
Climate change and sustainability legislation in recent years has led to significant changes in cons...
Energy usage of households accounts for a significant portion of total energy consumption and carbon...
In the UK housing sector, changes to building regulations have raised standards for fabric performan...
This paper will describe the results of a 2-year monitoring programme of 4 Passivhaus dwellings in S...
The performance, monitored over 2 years, of side by side detached Welsh Passive is presented. The ho...
The monitored performance of the first new London dwelling certified to the Passive House standard i...
In the UK housing sector, changes to building regulations have raised standards for fabric performan...
It is estimated that 80% of the 2050 building stock already exists and given targets of an 80% reduc...
In real operation, buildings rarely perform as predicted during the design phase. The mismatch betwe...
This Technical Paper sets out the pre-‐ and post-‐ intervention monitoring work carried out by The...
Summary The work aims to estimate the likely duration of monitoring which will be required to allow ...