International audienceThe aging of prestressed concrete containments wall of nuclear power plants is experimentally modelled by a 1/3 scale mock-up of 15 m in diameter and 20 m in high carried out by EDF within the VeRCoRs project. This aging leads to the modification of the concrete properties as well as to possible mechanical damage during a pressurization cycle at 4.2 bars of the containment. This pressurisation carried out annually on the mock up, represents the conditions of the ten-year inspections imposed by the French regulations for Nuclear Power Plants (NPP).On the basis of several previous projects having developed Non Destructive Techniques (NDT) for civil engineering in laboratory and structured their transfer on site, a consor...