This paper addresses a two-machine re-entrant flow shop scheduling problem with stochastic processing times where each job is expected to require a rework phase, flowing twice within the whole system. Due to the stochastic characteristics of the addressed problem, the proposed approach aims to devise robust schedules, i.e., schedules that are less sensitive to the occurrence of uncertain events, specifically, to the variability of the processing times. Two classes of approaches are proposed: the first is a branch-and-bound algorithm capable of solving the problem optimally, although with limitations regarding the size of the scheduling instances; the second is heuristic algorithms that can be applied to medium/large instances. For both appr...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...
International audienceSimultaneously scheduling jobs and preventive maintenance is a topical subject...
Minimizing the number of late jobs on a single machine is a classic scheduling problem, which can be...
This paper addresses a two-machine re-entrant flow shop scheduling problem with stochastic processin...
Planning and scheduling approaches in real manufacturing environments entail the need to cope with r...
AbstractThis paper focuses on a two machine re-entrant flow shop scheduling problem with the objecti...
International audienceThis work proposes an exact solution approach for the two-machine robust flow ...
The environment of Flow Shop Scheduling Problems (FSSPs) to minimize the makespan of n jobs that hav...
Remanufacturing processes are characterised by uncertainty due to the unpredictable status of used p...
The two-machine flowshop problem, where setup and removal times are independent from processing time...
This paper addresses the issue of how to best execute the schedule in a two-phase scheduling decisio...
The two-machine flowshop scheduling problem with the performance measure of total tardiness is addre...
The research in the field of robust scheduling aims at devising schedules which are not sensitive—to...
In many scheduling studies, researchers consider the processing times of jobs as constant numbers. T...
Since real manufacturing is dynamic and tends to suffer a wide range of uncertainties, research on p...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...
International audienceSimultaneously scheduling jobs and preventive maintenance is a topical subject...
Minimizing the number of late jobs on a single machine is a classic scheduling problem, which can be...
This paper addresses a two-machine re-entrant flow shop scheduling problem with stochastic processin...
Planning and scheduling approaches in real manufacturing environments entail the need to cope with r...
AbstractThis paper focuses on a two machine re-entrant flow shop scheduling problem with the objecti...
International audienceThis work proposes an exact solution approach for the two-machine robust flow ...
The environment of Flow Shop Scheduling Problems (FSSPs) to minimize the makespan of n jobs that hav...
Remanufacturing processes are characterised by uncertainty due to the unpredictable status of used p...
The two-machine flowshop problem, where setup and removal times are independent from processing time...
This paper addresses the issue of how to best execute the schedule in a two-phase scheduling decisio...
The two-machine flowshop scheduling problem with the performance measure of total tardiness is addre...
The research in the field of robust scheduling aims at devising schedules which are not sensitive—to...
In many scheduling studies, researchers consider the processing times of jobs as constant numbers. T...
Since real manufacturing is dynamic and tends to suffer a wide range of uncertainties, research on p...
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem wit...
International audienceSimultaneously scheduling jobs and preventive maintenance is a topical subject...
Minimizing the number of late jobs on a single machine is a classic scheduling problem, which can be...