The construction sector is one of the significant sectors supporting the Malaysian economy. The nature of construction works has made it liable to risk, thereby making risk management an integral part of project management, particularly in developing countries. Experts from the academic and construction circles have been studying risk management's effectiveness concerning the encountered problems and the solutions. This study’s objectives are to evaluate the level of construction risk management practices among the large construction contractors (G7 contractors) operating in Peninsular Malaysia, to examine the effect of organizational structure and organizational internal factors on construction risk management practices, and the moderating...
Over the decade, the level of risk management has always been lingering in every construction indust...
This study investigated the individual factors affecting contractors’ risk attitudes and further det...
Abstract - Often times, contractors failed to identify, plan, strategize, analyzed, execute, monitor...
The construction sector plays a significant role in contributing to a country’s economy. But a very ...
Many previously conducted empirical studies have displayed mixed findings about the influence of int...
Construction industry in Malaysia have been bedevilled by myriads of risk issues which have hampered...
An increased demand has been placed on construction projects to be more accountable to their clients...
The Malaysian construction industry often acts as a vehicle that motivates' the development of the n...
Project risk assessment is an operative tool for development and controlling cost, time, and attaini...
Risks always lead to the failure of the contractor to complete projects on time. This situation is c...
Construction is one of the highest risk business exist. Generally the overrun of the cost and time i...
Contractors’ risk attitudes influence their bidding decisions because of their exposure to uncertain...
Over the decade, the level of risk management has always been lingering in every construction indust...
Many critical factors influence the effectiveness of risk management. There is unanimity among proje...
Purpose: The main parties in construction projects are the engineers, clients, architects, contracto...
Over the decade, the level of risk management has always been lingering in every construction indust...
This study investigated the individual factors affecting contractors’ risk attitudes and further det...
Abstract - Often times, contractors failed to identify, plan, strategize, analyzed, execute, monitor...
The construction sector plays a significant role in contributing to a country’s economy. But a very ...
Many previously conducted empirical studies have displayed mixed findings about the influence of int...
Construction industry in Malaysia have been bedevilled by myriads of risk issues which have hampered...
An increased demand has been placed on construction projects to be more accountable to their clients...
The Malaysian construction industry often acts as a vehicle that motivates' the development of the n...
Project risk assessment is an operative tool for development and controlling cost, time, and attaini...
Risks always lead to the failure of the contractor to complete projects on time. This situation is c...
Construction is one of the highest risk business exist. Generally the overrun of the cost and time i...
Contractors’ risk attitudes influence their bidding decisions because of their exposure to uncertain...
Over the decade, the level of risk management has always been lingering in every construction indust...
Many critical factors influence the effectiveness of risk management. There is unanimity among proje...
Purpose: The main parties in construction projects are the engineers, clients, architects, contracto...
Over the decade, the level of risk management has always been lingering in every construction indust...
This study investigated the individual factors affecting contractors’ risk attitudes and further det...
Abstract - Often times, contractors failed to identify, plan, strategize, analyzed, execute, monitor...