This poster introduces an FPGA-based front-end module emulator developed for the High Granularity Timing Detector (HGTD) project within the ATLAS experiment. The emulator serves as a stand-in for the HGTD readout module during the project's initial design phase. Utilizing a Xilinx-Spartan 7 FPGA (XC7S15-2CPGA196C), the emulator simulates the digital functionalities of the ASIC chip (ALTIROC) used in the readout module. Notably, the emulator maintains identical overall dimensions and connectors as the readout module, ensuring seamless integration into the testing framework. The emulator's key advantage lies in its ability to act as a temporary replacement for the readout module during system tests, mitigating project delays caused by readout...
experiment at Japan Particle Accelerator Research Complex (JPARC). Before being digitized, the diffe...
International audienceALTIROC0 is an 8-channel ASIC prototype designed to readout 1x1 or 2x2 mm2 50 ...
In 2024 the LHC will be shut down for an extended period to perform upgrades to the instrument and t...
This poster introduces an FPGA-based front-end module emulator developed for the High Granularity Ti...
The High-Granularity Timing Detector (HGTD) will improve the performance of the ATLAS detector for t...
International audienceThis paper presents the design and characterisation of a front-end prototype A...
The High-Granularity Timing Detector (HGTD) will improve the performance of the ATLAS detector for t...
The High-Granularity Timing Detector is a detector proposed for the ATLAS Phase II upgrade. The dete...
A hardware emulation of the CMS pixel detector phase 1 upgrade front-end electronics has been develo...
The High Granularity Timing Detector (HGTD) is a proposed silicon detector for the forward region of...
The High Granularity Timing Detector (HGTD) is designed for the mitigation of pile-up effects in the...
The High Granularity Timing Detector (HGTD) is designed for the mitigation of pile-up effects in the...
A High Granularity Timing Detector (HGTD) has been proposed for the ATLAS phase-II upgrade to reduce...
The world’s largest particle accelerator, called Large Hadron Collider (LHC), will go through a long...
For the High-Luminosity phase of LHC, the ATLAS experiment is proposing the addition of a High Granu...
experiment at Japan Particle Accelerator Research Complex (JPARC). Before being digitized, the diffe...
International audienceALTIROC0 is an 8-channel ASIC prototype designed to readout 1x1 or 2x2 mm2 50 ...
In 2024 the LHC will be shut down for an extended period to perform upgrades to the instrument and t...
This poster introduces an FPGA-based front-end module emulator developed for the High Granularity Ti...
The High-Granularity Timing Detector (HGTD) will improve the performance of the ATLAS detector for t...
International audienceThis paper presents the design and characterisation of a front-end prototype A...
The High-Granularity Timing Detector (HGTD) will improve the performance of the ATLAS detector for t...
The High-Granularity Timing Detector is a detector proposed for the ATLAS Phase II upgrade. The dete...
A hardware emulation of the CMS pixel detector phase 1 upgrade front-end electronics has been develo...
The High Granularity Timing Detector (HGTD) is a proposed silicon detector for the forward region of...
The High Granularity Timing Detector (HGTD) is designed for the mitigation of pile-up effects in the...
The High Granularity Timing Detector (HGTD) is designed for the mitigation of pile-up effects in the...
A High Granularity Timing Detector (HGTD) has been proposed for the ATLAS phase-II upgrade to reduce...
The world’s largest particle accelerator, called Large Hadron Collider (LHC), will go through a long...
For the High-Luminosity phase of LHC, the ATLAS experiment is proposing the addition of a High Granu...
experiment at Japan Particle Accelerator Research Complex (JPARC). Before being digitized, the diffe...
International audienceALTIROC0 is an 8-channel ASIC prototype designed to readout 1x1 or 2x2 mm2 50 ...
In 2024 the LHC will be shut down for an extended period to perform upgrades to the instrument and t...