Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. Panca Pilar Madiun is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. Panca Pilar Madiun, includes system flow, Contextual Data Model(CDM), and User Interface(UI)
One of the problems faced by the contractors is an inappropriate scheduling method. For project sche...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
In the current era, the development of construction really needs to be done by implementing quality ...
PT. Pakarti Tirtoagung is one of the companies engaged in construction services in Indonesia, in the...
Project planning has several stages or project activity plans that can result in the running of a pr...
The process of planning and project control during the execution of the construction project work is...
The process of planning and project control during the execution of the construction project work is...
A project will have a time limit (deadline) of any activity that takes place, which means that the p...
Scheduling is an important thing to do when completing a project. But sometimes the implementation d...
PT. Nangendi Eastern Star is a company engaged in construction that handles multiple building projec...
Project scheduling is an important task in project management which monitors the project duration, r...
Pada proyek pembangunan offshore platform dibutuhkan penjadwalan yang baik agar seluruh proses dalam...
Time management is a necessary part of the process to ensure project completion time. Time managemen...
The success and failure of project implementation is often caused by poor planning and ineffective c...
The efficiency of project implementation time becomes one of the efforts in optimizing the use of im...
One of the problems faced by the contractors is an inappropriate scheduling method. For project sche...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
In the current era, the development of construction really needs to be done by implementing quality ...
PT. Pakarti Tirtoagung is one of the companies engaged in construction services in Indonesia, in the...
Project planning has several stages or project activity plans that can result in the running of a pr...
The process of planning and project control during the execution of the construction project work is...
The process of planning and project control during the execution of the construction project work is...
A project will have a time limit (deadline) of any activity that takes place, which means that the p...
Scheduling is an important thing to do when completing a project. But sometimes the implementation d...
PT. Nangendi Eastern Star is a company engaged in construction that handles multiple building projec...
Project scheduling is an important task in project management which monitors the project duration, r...
Pada proyek pembangunan offshore platform dibutuhkan penjadwalan yang baik agar seluruh proses dalam...
Time management is a necessary part of the process to ensure project completion time. Time managemen...
The success and failure of project implementation is often caused by poor planning and ineffective c...
The efficiency of project implementation time becomes one of the efforts in optimizing the use of im...
One of the problems faced by the contractors is an inappropriate scheduling method. For project sche...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
In the current era, the development of construction really needs to be done by implementing quality ...